Mathematical Model for Estimating the Cost of Laterite-Quarry Dust Cement Block

The cost of Block production which largely depends on the cost of the constituent materials, affects the overall cost of construction. In this paper, a model based on mixture experiment was formulated to optimize cost of block (in Naira). Using the model, one can predict the cost per cubic meter of block if the mix ratios are given. The model can also give possible mix ratios for a specified cost. The model is tested for lack of fit using statically tool and found adequate.

Authors

Publication Details

Journal
Saudi Journal of Civil Engineering
Published
2024-11-20
DOI
https://doi.org/10.36348/sjce.2024.v08i09.004
Primary Topic
Geotechnical and Geomechanical Engineering
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Mathematical Model for Estimating the Cost of Laterite-Quarry Dust Cement Block

Desmond E. Ewa, Enang Egbe, Godwin Adie Akeke
Saudi Journal of Civil Engineering
Geotechnical and Geomechanical Engineering
article

Mathematical Model for Estimating the Cost of Laterite-Quarry Dust Cement Block

Desmond E. Ewa, Enang Egbe, Godwin Adie Akeke
article en

Abstract

The cost of Block production which largely depends on the cost of the constituent materials, affects the overall cost of construction. In this paper, a model based on mixture experiment was formulated to optimize cost of block (in Naira). Using the model, one can predict the cost per cubic meter of block if the mix ratios are given. The model can also give possible mix ratios for a specified cost. The model is tested for lack of fit using statically tool and found adequate.

Saudi Journal of Civil EngineeringVol. 8(09)
Openalex Percentile: Top 76%
Geotechnical and Geomechanical Engineering
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Mathematical Model for Estimating the Cost of Laterite-Quarry Dust Cement Block — Desmond E. Ewa, Enang Egbe, et al. · Saudi Journal of Civil Engineering (2024) | TGRS Research Map | TGRS