New railway Dresden–Prague: Ore Mountains tunnel—Preliminary design using <scp>BIM</scp>

Abstract The Dresden–Prague railway line is an important part of the core TEN‐T Orient/Eastern Mediterranean corridor and a major link between Germany and the Czech Republic. The aim of the project is to reduce journey times for international passenger trains and increase capacity for freight trains. At the same time, it will extend the railway network in Central Europe and develop high‐speed transport in the Czech Republic. The project will also provide a flood‐safe alternative to the Elbe Valley, encouraging a modal shift from road to rail. The core element of this project is the cross‐border base tunnel under the Ore Mountains. During the preliminary design, two basic alternatives (“full tunnel” and “partial tunnel”) are being examined. It was announced on November 20, 2023, that the preferred option for the new Dresden–Prague line is the “full tunnel” alternative. For this reason, the article focuses mainly on the technical solutions for the Ore Mountain Tunnel of the “full tunnel” alternative. The BIM methodology was a key element in the preliminary design phase. The model was to be used as the main source of information in the design process and in the development of solutions. It also allowed detailed decisions to be made at an early stage.

Authors

Institutions

Publication Details

Journal
Civil Engineering Design
Published
2024-11-29
DOI
https://doi.org/10.1002/cend.202400031
Primary Topic
Geodetic Measurements and Engineering Structures
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

New railway Dresden–Prague: Ore Mountains tunnel—Preliminary design using BIM

Gerold Lenz, Christian Stöckl, Stefan Hanz, Anna‐Lena Hammer et al.
Civil Engineering Design
Geodetic Measurements and Engineering Structures
article

New railway Dresden–Prague: Ore Mountains tunnel—Preliminary design using BIM

Gerold Lenz, Christian Stöckl, Stefan Hanz, Anna‐Lena Hammer, Roman Sabata
article en

Abstract

Abstract The Dresden–Prague railway line is an important part of the core TEN‐T Orient/Eastern Mediterranean corridor and a major link between Germany and the Czech Republic. The aim of the project is to reduce journey times for international passenger trains and increase capacity for freight trains. At the same time, it will extend the railway network in Central Europe and develop high‐speed transport in the Czech Republic. The project will also provide a flood‐safe alternative to the Elbe Valley, encouraging a modal shift from road to rail. The core element of this project is the cross‐border base tunnel under the Ore Mountains. During the preliminary design, two basic alternatives (“full tunnel” and “partial tunnel”) are being examined. It was announced on November 20, 2023, that the preferred option for the new Dresden–Prague line is the “full tunnel” alternative. For this reason, the article focuses mainly on the technical solutions for the Ore Mountain Tunnel of the “full tunnel” alternative. The BIM methodology was a key element in the preliminary design phase. The model was to be used as the main source of information in the design process and in the development of solutions. It also allowed detailed decisions to be made at an early stage.

Civil Engineering DesignVol. 6(4)
Vienna Consulting Engineers (Austria) (AT)
Openalex Percentile: Top 76%
Geodetic Measurements and Engineering Structures
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.