Artificial neural network for solving flow shop optimization problem with sequence independent setup time

Abstract In this paper, we will study the permutation flow shop scheduling problem (PFSSP) with sequence independent setup time (SIST). This constraint is the most common encountered in industrial production. In this case, the SIST constraint depends on the technology nature of the machine, as well as the means used to prepare it for the execution of a new job. The purpose of this paper is to develop an artificial intelligence system and to train a neural network model for solving the flow shop scheduling problem. The objective function is to minimize the total completion time, which is known as makespan. The latter is an important task in manufacturing systems. The paper begins by suggesting an exact and four approximate methods: a mixed integer linear programming (MILP), an artificial neural network (ANN), and three e cient heuristics. The first heuristic is based on Johnson’s rule algorithm (ABJR), the second on the Nawaz-Enscore and Ham algorithm (NEH), and the last on the greedy randomized adaptive search procedure algorithm (GRASP). We aim to verify the e ectiveness of our resolution algorithms by considering randomly generated instances with n jobs and m machines in the flow shop factory. Our goal is to determine the optimal sequence of n jobs to be scheduled on m machines. The paper moves to the comparison between the studied heuristics. The numerical results demonstrate that the NEH algorithm outperforms the other approximate methods for our considered problem. Indeed, the NEH heuristic performs a success rate of 82.81% and achieves a minimum relative percentage deviation value of 0.0139%. It was observed that ANN method outperforms GRASP and gives sometimes best results than ABJR. The numerical simulations align with our theoretical postulations given by RPD values.

Authors

Institutions

Publication Details

Journal
Foundations of Computing and Decision Sciences
Published
2024-11-29
DOI
https://doi.org/10.2478/fcds-2024-0018
Citations
2
Primary Topic
Scheduling and Optimization Algorithms
Type
article
Field-Weighted Citation Impact
0.70
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Artificial neural network for solving flow shop optimization problem with sequence independent setup time

Hajar Sadki, Karam Allali
2 citations
Foundations of Computing and Decision Sciences
Scheduling and Optimization Algorithms
0.70
article

Artificial neural network for solving flow shop optimization problem with sequence independent setup time

Hajar Sadki, Karam Allali
article en
2 citations

Abstract

Abstract In this paper, we will study the permutation flow shop scheduling problem (PFSSP) with sequence independent setup time (SIST). This constraint is the most common encountered in industrial production. In this case, the SIST constraint depends on the technology nature of the machine, as well as the means used to prepare it for the execution of a new job. The purpose of this paper is to develop an artificial intelligence system and to train a neural network model for solving the flow shop scheduling problem. The objective function is to minimize the total completion time, which is known as makespan. The latter is an important task in manufacturing systems. The paper begins by suggesting an exact and four approximate methods: a mixed integer linear programming (MILP), an artificial neural network (ANN), and three e cient heuristics. The first heuristic is based on Johnson’s rule algorithm (ABJR), the second on the Nawaz-Enscore and Ham algorithm (NEH), and the last on the greedy randomized adaptive search procedure algorithm (GRASP). We aim to verify the e ectiveness of our resolution algorithms by considering randomly generated instances with n jobs and m machines in the flow shop factory. Our goal is to determine the optimal sequence of n jobs to be scheduled on m machines. The paper moves to the comparison between the studied heuristics. The numerical results demonstrate that the NEH algorithm outperforms the other approximate methods for our considered problem. Indeed, the NEH heuristic performs a success rate of 82.81% and achieves a minimum relative percentage deviation value of 0.0139%. It was observed that ANN method outperforms GRASP and gives sometimes best results than ABJR. The numerical simulations align with our theoretical postulations given by RPD values.

Foundations of Computing and Decision SciencesVol. 49(4)
Université Hassan II Mohammedia (MA)
Industry, innovation and infrastructure
Openalex Percentile: Top 24%
Scheduling and Optimization Algorithms
0.70
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Artificial neural network for solving flow shop optimization problem with sequence independent setup time — Hajar Sadki, Karam Allali · Foundations of Computing and Decision Sciences (2024) | TGRS Research Map | TGRS