Developing of a Multi-Project Planning and Control System for Risk-Based Precast Concrete Procurement to Increase PT. XY’s Competitiveness

Multi-project planning and control must be part of the precast concrete industry to achieve more efficient project performance and impact obtaining better contract values. It requires a clear and detailed understanding of the project's scope and the risks in project planning. This research aims to analyze the risk factors that influence ongoing multi-project procurement and carry out risk-based development to increase the Competitiveness of PT XY. This research uses a methodology to study related literature, previous research, and PT Company Operational Standards. XY. The results of this study indicate that 7 out of 37 variables have high-risk values, while the remaining 30 are classified as having moderate Risk. The Risk of wage and material price increases represents the highest Risk in developing a multi-project planning and control system for precast concrete procurement to enhance the Competitiveness of PT. XY.

Authors

Institutions

Publication Details

Journal
International Journal Of Science Technology & Management
Published
2024-11-28
DOI
https://doi.org/10.46729/ijstm.v5i6.1198
Primary Topic
Management and Optimization Techniques
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Developing of a Multi-Project Planning and Control System for Risk-Based Precast Concrete Procurement to Increase PT. XY’s Competitiveness

Fadhilah Muslim, Widiasih Widiasih
International Journal Of Science Technology & Management
Management and Optimization Techniques
article

Developing of a Multi-Project Planning and Control System for Risk-Based Precast Concrete Procurement to Increase PT. XY’s Competitiveness

Fadhilah Muslim, Widiasih Widiasih
article en

Abstract

Multi-project planning and control must be part of the precast concrete industry to achieve more efficient project performance and impact obtaining better contract values. It requires a clear and detailed understanding of the project's scope and the risks in project planning. This research aims to analyze the risk factors that influence ongoing multi-project procurement and carry out risk-based development to increase the Competitiveness of PT XY. This research uses a methodology to study related literature, previous research, and PT Company Operational Standards. XY. The results of this study indicate that 7 out of 37 variables have high-risk values, while the remaining 30 are classified as having moderate Risk. The Risk of wage and material price increases represents the highest Risk in developing a multi-project planning and control system for precast concrete procurement to enhance the Competitiveness of PT. XY.

International Journal Of Science Technology & ManagementVol. 5(6)
University of Indonesia (ID)
Openalex Percentile: Top 63%
Management and Optimization Techniques
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.