PENANGANAN PENGURANGAN JUMLAH DOWNTIME BERLEBIH DARI UNIT ABC 1 DENGAN PENDEKATAN LEAN MAINTENANCE PADA PT. XYZ

PT. XYZ is a manufacturing company that operates in the field of fertilizer and non-fertilizer production with the aim of helping the country realize a food self-sufficiency program. It is known that PT. XYZ has problems with excessive machine downtime in its production process. Problems occur because there is repeated damage to the machine, activities that involve waste, so that the maintenance system on one machine has not been carried out optimally. The aim of this research is to analyze maintenance activities implemented in the Company and then minimize waste in maintenance activities using a lean maintenance approach. Downtime data collection was carried out in April 2024, then data processing was carried out using equipment effectiveness to see how effective the existing equipment was, then continued with Maintenance Value Stream Mapping (MVSM) to find out waste that occurred during the maintenance process, after the cause of the waste. is known, several suggested options are given to minimize the waste that occurs. From the implementation of the recommendations made, the machine equipment effectiveness value increased from 92% to 97%, the maintenance effectiveness value increased from 41.6% to 66.7%.

Authors

Institutions

Publication Details

Journal
SIGMA TEKNIKA
Published
2024-11-26
DOI
https://doi.org/10.33373/sigmateknika.v7i2.7001
Primary Topic
Management and Optimization Techniques
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

PENANGANAN PENGURANGAN JUMLAH DOWNTIME BERLEBIH DARI UNIT ABC 1 DENGAN PENDEKATAN LEAN MAINTENANCE PADA PT. XYZ

Nina Aini Mahbubah, Aditya Hendi Prakoso
SIGMA TEKNIKA
Management and Optimization Techniques
article

PENANGANAN PENGURANGAN JUMLAH DOWNTIME BERLEBIH DARI UNIT ABC 1 DENGAN PENDEKATAN LEAN MAINTENANCE PADA PT. XYZ

Nina Aini Mahbubah, Aditya Hendi Prakoso
article en

Abstract

PT. XYZ is a manufacturing company that operates in the field of fertilizer and non-fertilizer production with the aim of helping the country realize a food self-sufficiency program. It is known that PT. XYZ has problems with excessive machine downtime in its production process. Problems occur because there is repeated damage to the machine, activities that involve waste, so that the maintenance system on one machine has not been carried out optimally. The aim of this research is to analyze maintenance activities implemented in the Company and then minimize waste in maintenance activities using a lean maintenance approach. Downtime data collection was carried out in April 2024, then data processing was carried out using equipment effectiveness to see how effective the existing equipment was, then continued with Maintenance Value Stream Mapping (MVSM) to find out waste that occurred during the maintenance process, after the cause of the waste. is known, several suggested options are given to minimize the waste that occurs. From the implementation of the recommendations made, the machine equipment effectiveness value increased from 92% to 97%, the maintenance effectiveness value increased from 41.6% to 66.7%.

SIGMA TEKNIKAVol. 7(2)
Universitas Muhammadiyah Gresik (ID)
Zero hunger
Openalex Percentile: Top 63%
Management and Optimization Techniques
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.