Exploring dynamics of stakeholder salience and functional roles in megaproject collaborative innovation system: insights from the Hong Kong-Zhuhai-Macao Bridge

Purpose Megaprojects provide an ideal context for exploring the dynamic characteristics of stakeholders within a collaborative innovation system. This research aims to examine the changes in stakeholder salience and functional roles during the evolution of such a system. Design/methodology/approach This study is empirically grounded on the Hong Kong-Zhuhai-Macao Bridge (HZMB) megaproject in China, analyzed with the stakeholder salience, stakeholder functional role, stakeholder dynamics and collaborative innovation system theoretical lens. Findings The megaproject collaborative innovation system can be divided into four stages: the birth stage, development stage, mature stage and re-innovation stage. Stakeholder salience generally remains unchanged throughout the lifecycle of the collaborative innovation system, except for engineering consulting firms (ECF). ECF transitioned from a definitive stakeholder to an expectant stakeholder upon project completion. The number of definitive stakeholders during the first three stages increases gradually. Besides, stakeholder functional roles shift in eight different directions throughout the lifecycle of the megaproject collaborative innovation system because they possess different core resources necessary for implementing innovations and are positioned differently within the collaborative innovation system. Originality/value This study contributes to the theory and practice of collaborative innovation in megaprojects. First, it offers insights into the evolution of megaproject collaborative innovation systems from the perspective of stakeholder interactions. Second, it has significant implications for managing stakeholder relationships based on their salience and functional roles at different stages of the collaborative innovation system.

Authors

Institutions

Publication Details

Journal
Engineering Construction & Architectural Management
Published
2024-11-28
DOI
https://doi.org/10.1108/ecam-09-2023-0915
Citations
4
Primary Topic
Construction Project Management and Performance
Type
article
Field-Weighted Citation Impact
1.96
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Exploring dynamics of stakeholder salience and functional roles in megaproject collaborative innovation system: insights from the Hong Kong-Zhuhai-Macao Bridge

Yan Liu, Giorgio Locatelli, Xinyue Zhang, Xiaoyan Chen et al.
4 citations
Engineering Construction & Architectural Management
Construction Project Management and Performance
1.96
article

Exploring dynamics of stakeholder salience and functional roles in megaproject collaborative innovation system: insights from the Hong Kong-Zhuhai-Macao Bridge

Yan Liu, Giorgio Locatelli, Xinyue Zhang, Xiaoyan Chen, Qinghua He
article en
4 citations

Abstract

Purpose Megaprojects provide an ideal context for exploring the dynamic characteristics of stakeholders within a collaborative innovation system. This research aims to examine the changes in stakeholder salience and functional roles during the evolution of such a system. Design/methodology/approach This study is empirically grounded on the Hong Kong-Zhuhai-Macao Bridge (HZMB) megaproject in China, analyzed with the stakeholder salience, stakeholder functional role, stakeholder dynamics and collaborative innovation system theoretical lens. Findings The megaproject collaborative innovation system can be divided into four stages: the birth stage, development stage, mature stage and re-innovation stage. Stakeholder salience generally remains unchanged throughout the lifecycle of the collaborative innovation system, except for engineering consulting firms (ECF). ECF transitioned from a definitive stakeholder to an expectant stakeholder upon project completion. The number of definitive stakeholders during the first three stages increases gradually. Besides, stakeholder functional roles shift in eight different directions throughout the lifecycle of the megaproject collaborative innovation system because they possess different core resources necessary for implementing innovations and are positioned differently within the collaborative innovation system. Originality/value This study contributes to the theory and practice of collaborative innovation in megaprojects. First, it offers insights into the evolution of megaproject collaborative innovation systems from the perspective of stakeholder interactions. Second, it has significant implications for managing stakeholder relationships based on their salience and functional roles at different stages of the collaborative innovation system.

Engineering Construction & Architectural ManagementVol. 33(2)
Tongji University (CN), The University of Sydney (AU), Project Management Institute (US), Nanjing University of Information Science and Technology (CN), Nanjing University of Science and Technology (CN), Beijing University of Civil Engineering and Architecture (CN), Nanjing University (CN), Politecnico di Milano (IT)
Industry, innovation and infrastructure
Openalex Percentile: Top 12%
Construction Project Management and Performance
1.96
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.