Influence of the Soil Squeezing Effect on the Peripile Soil of Pre-Tensioned H-Type Prestressed Concrete Revetment Pile Construction Based on Field Tests

Pre-tensioned H-type prestressed concrete revetment piles are a newly developed product dedicated to the protection of river, lake, and sea bank embankments, and their cross-section is H-shaped. In this study, a field test of H-type pile soil’s squeezing effect is carried out based on the second phase project of the HujiaShen Line. Pore water pressure, soil displacement, and other parameters of the H-type pile-driving process are monitored in real time. The test results show the following: (1) The influence range of the excess pore water pressure caused by the soil squeezing effect in the horizontal direction is about 14–15D, and in the vertical direction, the pore water pressure within a depth range of about 7D below the pile bottom increases rapidly. Its dissipation rate is fast at first and then slows down, and it completely dissipates 20 days after piling. (2) The excess pore water pressure caused by the soil squeezing effect does not decrease linearly in the radial direction. The soil around the construction pile can be divided into four areas: A, B, C, and D. Among them, A and B belong to the plastic zone, and C and D belong to the elastic zone. (3) The horizontal displacement of the soil occurs within the depth range of 5D from the surface of the pile to the bottom of the pile at the piling location, and the radial influence range is about 8–12D. From a vertical perspective, the main horizontal displacement of the soil occurs in the long section of the pile driven into the soil, showing a “U”-shaped distribution. (4) The dividing point between the vertical displacement uplift and the settlement of the soil appears within the range of 2–3 m from the construction pile, that is, between 5 and 7D. Settlement occurs after the piling is completed, and the settlement rate is fast at first and then slows down. The final settlement of the soil is stable on the 20th day. This research and experiment provide a design reference for the engineering application of pre-tensioned H-type prestressed concrete bank protection piles.

Authors

Institutions

Publication Details

Journal
Buildings
Published
2024-11-28
DOI
https://doi.org/10.3390/buildings14123816
Primary Topic
Geotechnical Engineering and Soil Stabilization
Type
article
Field-Weighted Citation Impact
0.00

Funders

Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Influence of the Soil Squeezing Effect on the Peripile Soil of Pre-Tensioned H-Type Prestressed Concrete Revetment Pile Construction Based on Field Tests

Jian Liu, Xiao Yu, Yue-dong Wu
Buildings
Geotechnical Engineering and Soil Stabilization
article

Influence of the Soil Squeezing Effect on the Peripile Soil of Pre-Tensioned H-Type Prestressed Concrete Revetment Pile Construction Based on Field Tests

Jian Liu, Xiao Yu, Yue-dong Wu
article en

Abstract

Pre-tensioned H-type prestressed concrete revetment piles are a newly developed product dedicated to the protection of river, lake, and sea bank embankments, and their cross-section is H-shaped. In this study, a field test of H-type pile soil’s squeezing effect is carried out based on the second phase project of the HujiaShen Line. Pore water pressure, soil displacement, and other parameters of the H-type pile-driving process are monitored in real time. The test results show the following: (1) The influence range of the excess pore water pressure caused by the soil squeezing effect in the horizontal direction is about 14–15D, and in the vertical direction, the pore water pressure within a depth range of about 7D below the pile bottom increases rapidly. Its dissipation rate is fast at first and then slows down, and it completely dissipates 20 days after piling. (2) The excess pore water pressure caused by the soil squeezing effect does not decrease linearly in the radial direction. The soil around the construction pile can be divided into four areas: A, B, C, and D. Among them, A and B belong to the plastic zone, and C and D belong to the elastic zone. (3) The horizontal displacement of the soil occurs within the depth range of 5D from the surface of the pile to the bottom of the pile at the piling location, and the radial influence range is about 8–12D. From a vertical perspective, the main horizontal displacement of the soil occurs in the long section of the pile driven into the soil, showing a “U”-shaped distribution. (4) The dividing point between the vertical displacement uplift and the settlement of the soil appears within the range of 2–3 m from the construction pile, that is, between 5 and 7D. Settlement occurs after the piling is completed, and the settlement rate is fast at first and then slows down. The final settlement of the soil is stable on the 20th day. This research and experiment provide a design reference for the engineering application of pre-tensioned H-type prestressed concrete bank protection piles.

BuildingsVol. 14(12)
Hohai University (CN), Nanjing Hydraulic Research Institute (CN)
National Natural Science Foundation of China
Life below water
Openalex Percentile: Top 76%
Geotechnical Engineering and Soil Stabilization
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.