Designing Vendor Performance Criteria Using Analytic Hierarchy Process Method On The Engineering Procurement Construction Project Company

Indonesia's electrical power supply is insufficient to meet the population's demands. Therefore, the rise of Renewable Energy (RE) is anticipated to fulfill the needs. One of Indonesia's renewable energy industries implementing project management in its operations encountered delays in its engineering procurement construction project due to material delay, and the project's quality failed to meet requirements due to an incompetent vendor. Furthermore, the existing key performance indicators were insufficiently comprehensive, lacked criteria related to business permits, and had unclear Critical Success Factors (CSF). The primary goal was to develop narrowly focused criteria to evaluate vendor construction performance through Multi-Criteria Decision-Making (MCDM). The Analytical Hierarchy Process (AHP) method is one of the techniques utilized in MCDM to determine the ranking of alternatives based on selection criteria that have hierarchical interdependence relationships. This study produced six main criteria based on literature studies, including management capability, financial capability, quality, delivery time, customer services, and safety. The most important sub-criteria from the results of this study are speed and accuracy of delivery time with a weight of 23,90%, where the factor of completing the project activity on time is a key factor for project success. For further handling, this criterion is considered as CSF for vendor selection at EPC projects, especially in the RE industry. Keywords: Analytic Hierarchy Process (AHP), Key Performance Indicator (KPI), Project Management, Procurement Management, Vendor

Authors

Institutions

Publication Details

Journal
Jurnal Teknik Industri Jurnal Hasil Penelitian dan Karya Ilmiah dalam Bidang Teknik Industri
Published
2024-10-12
DOI
https://doi.org/10.24014/jti.v10i2.32395
Citations
1
Primary Topic
Multi-Criteria Decision Making
Type
article
Field-Weighted Citation Impact
0.49
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Designing Vendor Performance Criteria Using Analytic Hierarchy Process Method On The Engineering Procurement Construction Project Company

Atya Nur Aisha, Intan Permatasari, Annisa Nursyahbani
1 citations
Jurnal Teknik Industri Jurnal Hasil Penelitian dan Karya Ilmiah dalam Bidang Teknik Industri
Multi-Criteria Decision Making
0.49
article

Designing Vendor Performance Criteria Using Analytic Hierarchy Process Method On The Engineering Procurement Construction Project Company

Atya Nur Aisha, Intan Permatasari, Annisa Nursyahbani
article en
1 citations

Abstract

Indonesia's electrical power supply is insufficient to meet the population's demands. Therefore, the rise of Renewable Energy (RE) is anticipated to fulfill the needs. One of Indonesia's renewable energy industries implementing project management in its operations encountered delays in its engineering procurement construction project due to material delay, and the project's quality failed to meet requirements due to an incompetent vendor. Furthermore, the existing key performance indicators were insufficiently comprehensive, lacked criteria related to business permits, and had unclear Critical Success Factors (CSF). The primary goal was to develop narrowly focused criteria to evaluate vendor construction performance through Multi-Criteria Decision-Making (MCDM). The Analytical Hierarchy Process (AHP) method is one of the techniques utilized in MCDM to determine the ranking of alternatives based on selection criteria that have hierarchical interdependence relationships. This study produced six main criteria based on literature studies, including management capability, financial capability, quality, delivery time, customer services, and safety. The most important sub-criteria from the results of this study are speed and accuracy of delivery time with a weight of 23,90%, where the factor of completing the project activity on time is a key factor for project success. For further handling, this criterion is considered as CSF for vendor selection at EPC projects, especially in the RE industry. Keywords: Analytic Hierarchy Process (AHP), Key Performance Indicator (KPI), Project Management, Procurement Management, Vendor

Jurnal Teknik Industri Jurnal Hasil Penelitian dan Karya Ilmiah dalam Bidang Teknik IndustriVol. 10(2)
Telkom University (ID)
Openalex Percentile: Top 28%
Multi-Criteria Decision Making
0.49
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Designing Vendor Performance Criteria Using Analytic Hierarchy Process Method On The Engineering Procurement Construction Project Company — Atya Nur Aisha, Intan Permatasari, et al. · Jurnal Teknik Industri Jurnal Hasil Penelitian dan Karya Ilmiah dalam Bidang Teknik Industri (2024) | TGRS Research Map | TGRS