Performance Consideration According to the Operation Correlation of Leg Transfer Type Inverter for Railway Vehicle Application

In this paper, for the purpose of increasing the stability of railway vehicles, the performance of a leg transfer type inverter was analyzed according to the correlation between relay and change of control amount operation. For this purpose, maximum overshoot current and transient state maintenance time were analyzed according to the operation sequence and operation delay between relay operation and change of control amount during leg transfer. As a result, no direct relationship between operation correlation and maximum overshoot current was confirmed. However, it was confirmed that when the control amount is changed first, the control stability is higher as it is controlled in a steady state even in the operation delay section. Accordingly, it was verified through hardware experiments that control stability can be improved when the leg transfer type inverter for railway vehicles operates first for the control amount change during leg change.

Authors

Publication Details

Journal
The Transactions of The Korean Institute of Electrical Engineers
Published
2024-11-28
DOI
https://doi.org/10.5370/kiee.2024.73.11.2140
Primary Topic
Engineering Applied Research
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Performance Consideration According to the Operation Correlation of Leg Transfer Type Inverter for Railway Vehicle Application

Jong-Ho Lim, Jin-Geun Shon, Jae-Gun Lee, Gildong Kim et al.
The Transactions of The Korean Institute of Electrical Engineers
Engineering Applied Research
article

Performance Consideration According to the Operation Correlation of Leg Transfer Type Inverter for Railway Vehicle Application

Jong-Ho Lim, Jin-Geun Shon, Jae-Gun Lee, Gildong Kim, Hyun-Jae Lee
article en

Abstract

In this paper, for the purpose of increasing the stability of railway vehicles, the performance of a leg transfer type inverter was analyzed according to the correlation between relay and change of control amount operation. For this purpose, maximum overshoot current and transient state maintenance time were analyzed according to the operation sequence and operation delay between relay operation and change of control amount during leg transfer. As a result, no direct relationship between operation correlation and maximum overshoot current was confirmed. However, it was confirmed that when the control amount is changed first, the control stability is higher as it is controlled in a steady state even in the operation delay section. Accordingly, it was verified through hardware experiments that control stability can be improved when the leg transfer type inverter for railway vehicles operates first for the control amount change during leg change.

The Transactions of The Korean Institute of Electrical EngineersVol. 73(11)
Openalex Percentile: Top 76%
Engineering Applied Research
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.