A Case Study: Drilling Longest Horizontal Extended Reach Well with Managed Pressure Drilling System in West Kazakhstan

Abstract Due to the impact of the geological nature of the Tengiz field, which is dominated by high fracture areas and has associated drilling challenges such as lost circulation, a first development trial well named as a "High-Pressure Lower Slope Development" (HPLSD) project well was initiated. The well was designed by the engineering team of Tengizchevroil to be horizontal producer with the longest lateral section in Kazakhstan. This paper describes Managed Pressure Drilling (MPD) and Managed Pressure Cementing (MPC) aspects of the HPLSD project. MPD was utilized on 12 ¼ × 13 ½", 8 ½", and 6" sections to improve drilling performance. The system was used to control bottom hole pressure and manage background gas, it was further applied to minimize loss/gain scenarios and allow drilling through the "narrow" margin between pore and fracture pressures, along with decreasing the wellbore instability and differential sticking risks. Constant Bottom Hole Pressure (CBHP) technique helped to successfully cement the 7 ¼" liner avoiding any losses of cementing fluid into the wellbore. The primary cementing of the 8 ½" hole section compiled of reservoir embedded with the layers of anhydrite and limestone has been associated with the risks of losing the cement slug, and therefore creating the risk of not achieving adequate cementation. The MPD system helped to successfully run in hole the 7 ¼" liner, cement it and finalize the 6" hole section running the Lower Completion in constant bottom hole pressure mode. MPD results examined in this paper provide the proof that MPD system is as reliable tool not only for drilling, but also for managed pressure cementing, compensation of swab effect, managing small volumes of influx, and circulating associated gas while drilling. The additional capabilities offered by MPD technology in effectively controlling wellbore pressure profiles has led to MPD tools becoming a commonplace in Tengiz drilling operations.

Authors

Institutions

Publication Details

Published
2024-11-26
DOI
https://doi.org/10.2118/223418-ms
Primary Topic
Drilling and Well Engineering
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

A Case Study: Drilling Longest Horizontal Extended Reach Well with Managed Pressure Drilling System in West Kazakhstan

Alibek Katenov, Kuanysh Kabiyev, Nurzhan Kamzayev, Akzharkyn Assetkyzy Tilekkabyl et al.
Drilling and Well Engineering
article

A Case Study: Drilling Longest Horizontal Extended Reach Well with Managed Pressure Drilling System in West Kazakhstan

Alibek Katenov, Kuanysh Kabiyev, Nurzhan Kamzayev, Akzharkyn Assetkyzy Tilekkabyl, Diana Amangeldiyeva, Z. Rakhmetov, Anvar Ismukhambetov, Timur Gabdulov, Dastan Takhanov, Dinara Kaisagaliyeva, Alibek Armiya, Amilina Kairzhanova
article en

Abstract

Abstract Due to the impact of the geological nature of the Tengiz field, which is dominated by high fracture areas and has associated drilling challenges such as lost circulation, a first development trial well named as a "High-Pressure Lower Slope Development" (HPLSD) project well was initiated. The well was designed by the engineering team of Tengizchevroil to be horizontal producer with the longest lateral section in Kazakhstan. This paper describes Managed Pressure Drilling (MPD) and Managed Pressure Cementing (MPC) aspects of the HPLSD project. MPD was utilized on 12 ¼ × 13 ½", 8 ½", and 6" sections to improve drilling performance. The system was used to control bottom hole pressure and manage background gas, it was further applied to minimize loss/gain scenarios and allow drilling through the "narrow" margin between pore and fracture pressures, along with decreasing the wellbore instability and differential sticking risks. Constant Bottom Hole Pressure (CBHP) technique helped to successfully cement the 7 ¼" liner avoiding any losses of cementing fluid into the wellbore. The primary cementing of the 8 ½" hole section compiled of reservoir embedded with the layers of anhydrite and limestone has been associated with the risks of losing the cement slug, and therefore creating the risk of not achieving adequate cementation. The MPD system helped to successfully run in hole the 7 ¼" liner, cement it and finalize the 6" hole section running the Lower Completion in constant bottom hole pressure mode. MPD results examined in this paper provide the proof that MPD system is as reliable tool not only for drilling, but also for managed pressure cementing, compensation of swab effect, managing small volumes of influx, and circulating associated gas while drilling. The additional capabilities offered by MPD technology in effectively controlling wellbore pressure profiles has led to MPD tools becoming a commonplace in Tengiz drilling operations.

Weatherford (Switzerland) (CH)
Openalex Percentile: Top 71%
Drilling and Well Engineering
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.