A Study on the Necessity and Development of Deconstructing Standard-Specification and Construction Guideline in Photovoltaic System

According to government support policies such as the Solar Home Distribution Project and Renewable Energy 3020, the amount of waste solar panels is expected to increase exponentially. Currently, when photovoltaic generation facilities are deconstructed, there is an electrical risk (such as electric shock) for workers because the photovoltaic system continues to generate power even after the grid side (KEPCO) is opened. In addition, there is no exist specialized standard-specification to ensure the safety and quality of the facility during deconstruction work. According to the “Solar Power Waste Panel Management Reinforcement Plan” of the Ministry of Trade, Industry and Energy and the Ministry of Environment, a standard-specification will be developed to enforce safety management during deconstruction. Therefore, in order to ensure the safety of on-site workers and construction quality during deconstruction of photovoltaic generation facilities, a standard specification and construction guide for deconstruction photovoltaic generation facilities were developed that reflects the characteristics of deconstruction works and improved accessibility for workers.

Authors

Publication Details

Journal
The Transactions of The Korean Institute of Electrical Engineers
Published
2024-10-31
DOI
https://doi.org/10.5370/kiee.2024.73.10.1744
Primary Topic
Energy and Environmental Systems
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

A Study on the Necessity and Development of Deconstructing Standard-Specification and Construction Guideline in Photovoltaic System

Seung-Cheol Hyun, M. Kim, Jong-Yong Wang, Won-Sik Moon
The Transactions of The Korean Institute of Electrical Engineers
Energy and Environmental Systems
article

A Study on the Necessity and Development of Deconstructing Standard-Specification and Construction Guideline in Photovoltaic System

Seung-Cheol Hyun, M. Kim, Jong-Yong Wang, Won-Sik Moon
article en

Abstract

According to government support policies such as the Solar Home Distribution Project and Renewable Energy 3020, the amount of waste solar panels is expected to increase exponentially. Currently, when photovoltaic generation facilities are deconstructed, there is an electrical risk (such as electric shock) for workers because the photovoltaic system continues to generate power even after the grid side (KEPCO) is opened. In addition, there is no exist specialized standard-specification to ensure the safety and quality of the facility during deconstruction work. According to the “Solar Power Waste Panel Management Reinforcement Plan” of the Ministry of Trade, Industry and Energy and the Ministry of Environment, a standard-specification will be developed to enforce safety management during deconstruction. Therefore, in order to ensure the safety of on-site workers and construction quality during deconstruction of photovoltaic generation facilities, a standard specification and construction guide for deconstruction photovoltaic generation facilities were developed that reflects the characteristics of deconstruction works and improved accessibility for workers.

The Transactions of The Korean Institute of Electrical EngineersVol. 73(10)
Openalex Percentile: Top 81%
Energy and Environmental Systems
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.