Performance and Efficiency Diffusion of US Surface Transportation Public–Private Partnerships

With successes and attritions, the US transportation industry has implemented public–private partnership (P3) projects for over 3 decades. However, performance inquiries of P3 have not kept up with its development, showing mixed results. The predominantly cross-sectional approach may mask a certain within-project effect on cost and time certainty. Using 133 major transportation projects from the Information Source for Major Projects database, the authors performed piecewise linear growth curve modeling to parse out variation attributable to delivery method and variation attributable to that within-project effect, conveniently termed efficiency diffusion. The results revealed that P3 is on par with design–bid–build (DBB) in terms of cost certainty, but performs better in terms of time certainty. In contrast, efficiency diffusion from P3 is evident in cost but not in time. In other words, P3 creates a spillover and internalization of technical and managerial innovations, inducing cost savings. This is the first longitudinal study to reconcile previous cross-sectional efforts, and showed P3’s better time certainty compared with DBB using project-level data in the US while confirming the delivery method’s cost-saving spillover effect, effectively raising the bar.

Authors

Institutions

Publication Details

Journal
Journal of Construction Engineering and Management
Published
2024-11-26
DOI
https://doi.org/10.1061/jcemd4.coeng-14592
Citations
2
Primary Topic
Public-Private Partnership Projects
Type
article
Field-Weighted Citation Impact
1.11
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Performance and Efficiency Diffusion of US Surface Transportation Public–Private Partnerships

Kunqi Zhang, Patrick DeCorla‐Souza, Qingbin Cui
2 citations
Journal of Construction Engineering and Management
Public-Private Partnership Projects
1.11
article

Performance and Efficiency Diffusion of US Surface Transportation Public–Private Partnerships

Kunqi Zhang, Patrick DeCorla‐Souza, Qingbin Cui
article en
2 citations

Abstract

With successes and attritions, the US transportation industry has implemented public–private partnership (P3) projects for over 3 decades. However, performance inquiries of P3 have not kept up with its development, showing mixed results. The predominantly cross-sectional approach may mask a certain within-project effect on cost and time certainty. Using 133 major transportation projects from the Information Source for Major Projects database, the authors performed piecewise linear growth curve modeling to parse out variation attributable to delivery method and variation attributable to that within-project effect, conveniently termed efficiency diffusion. The results revealed that P3 is on par with design–bid–build (DBB) in terms of cost certainty, but performs better in terms of time certainty. In contrast, efficiency diffusion from P3 is evident in cost but not in time. In other words, P3 creates a spillover and internalization of technical and managerial innovations, inducing cost savings. This is the first longitudinal study to reconcile previous cross-sectional efforts, and showed P3’s better time certainty compared with DBB using project-level data in the US while confirming the delivery method’s cost-saving spillover effect, effectively raising the bar.

Journal of Construction Engineering and ManagementVol. 151(1)
Federal Highway Administration (US), University of Maryland, College Park (US)
Partnerships for the goals
Openalex Percentile: Top 14%
Public-Private Partnership Projects
1.11
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.