Enhancing the Production Performance of Prefabricated Buildings through the Integrated Optimization of Precast Component Layout and Worker Allocation

The layout of precast components (PCs) made of concrete materials on movable mold tables not only affects the number of movable mold tables but also impacts worker allocation during production. However, previous studies, to our best knowledge, have not yet considered the optimal precast component (PC) layout when optimizing worker allocation, potentially leading to more time, costs, and carbon dioxide (CO2) emissions during production. As such, this study proposes a method for optimizing the PC layout on movable mold tables and worker allocation during production from the perspective of multiobjective trade-offs. This method has the following characteristics: (1) the Pareto optimality (PO) principle is adopted to address the trade-offs between multiple objectives, while discrete event simulation (DES) technology is used to simulate the production process of PCs; and (2) optimizing the PC layout serves as the basis for optimizing the worker allocation. A real production case is used for demonstrating and validating this method. The results show that: (1) the method searches for two Pareto-optimal PC layout schemes on movable mold tables and reduces the sum of processing-time variance in an assembly line by 44.15% without changing the number of movable mold tables or by 89.18% with adding six movable mold tables; and (2) based on these two PC layout schemes, this method further reduces costs and CO2 emissions by 6.97% and 14.56%, respectively, during production. Thus, the method represents a pioneering and effective achievement in the integrated multiobjective trade-off optimization of PC layout and worker allocation, thereby enriching the methodological system of industrial construction and lean construction. In addition, the method, findings, and recommendations in this study facilitate factory managers’ high-performance decision-making in addressing the trade-offs among time shortening, cost reduction, and CO2 emission mitigation during PC production.

Authors

Institutions

Publication Details

Journal
Journal of Construction Engineering and Management
Published
2024-11-26
DOI
https://doi.org/10.1061/jcemd4.coeng-15470
Citations
2
Primary Topic
BIM and Construction Integration
Type
article
Field-Weighted Citation Impact
0.53
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Enhancing the Production Performance of Prefabricated Buildings through the Integrated Optimization of Precast Component Layout and Worker Allocation

Zhenmin Yuan, Lingzhi Cao, Zhiyu Li, Yang Ye et al.
2 citations
Journal of Construction Engineering and Management
BIM and Construction Integration
0.53
article

Enhancing the Production Performance of Prefabricated Buildings through the Integrated Optimization of Precast Component Layout and Worker Allocation

Zhenmin Yuan, Lingzhi Cao, Zhiyu Li, Yang Ye, Wenjun Lin, Zhen Lei, Wei Zhang
article en
2 citations

Abstract

The layout of precast components (PCs) made of concrete materials on movable mold tables not only affects the number of movable mold tables but also impacts worker allocation during production. However, previous studies, to our best knowledge, have not yet considered the optimal precast component (PC) layout when optimizing worker allocation, potentially leading to more time, costs, and carbon dioxide (CO2) emissions during production. As such, this study proposes a method for optimizing the PC layout on movable mold tables and worker allocation during production from the perspective of multiobjective trade-offs. This method has the following characteristics: (1) the Pareto optimality (PO) principle is adopted to address the trade-offs between multiple objectives, while discrete event simulation (DES) technology is used to simulate the production process of PCs; and (2) optimizing the PC layout serves as the basis for optimizing the worker allocation. A real production case is used for demonstrating and validating this method. The results show that: (1) the method searches for two Pareto-optimal PC layout schemes on movable mold tables and reduces the sum of processing-time variance in an assembly line by 44.15% without changing the number of movable mold tables or by 89.18% with adding six movable mold tables; and (2) based on these two PC layout schemes, this method further reduces costs and CO2 emissions by 6.97% and 14.56%, respectively, during production. Thus, the method represents a pioneering and effective achievement in the integrated multiobjective trade-off optimization of PC layout and worker allocation, thereby enriching the methodological system of industrial construction and lean construction. In addition, the method, findings, and recommendations in this study facilitate factory managers’ high-performance decision-making in addressing the trade-offs among time shortening, cost reduction, and CO2 emission mitigation during PC production.

Journal of Construction Engineering and ManagementVol. 151(2)
University of New Brunswick (CA), Yanbian University (CN), Nanjing University of Science and Technology (CN), Yantai Nanshan University (CN), Shandong Jianzhu University (CN)
Openalex Percentile: Top 33%
BIM and Construction Integration
0.53
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.