Analysis of Existing Resource Distribution Metrics and Suggestion of New Metrics

Resource leveling aims to reduce peak resource demand and fluctuations in resource usage histograms throughout a construction period. The objective function optimum can be obtained in the digitalized construction management era. However, the correct quantification of uneven resource distribution is also essential because an improper resource distribution metric may even worsen the resource distribution. The behaviors of existing resource distribution metrics were not examined thoroughly in the literature. This study aims to improve existing resource distribution metrics and analyze the objective functions to identify their positive and negative aspects. Eight existing resource leveling metrics were analyzed by considering their responses to the peak resource demand and fluctuations in daily resource demand. The analysis uncovered that the existing metrics were insensitive to either resource fluctuations or peak resource demand. The time insensitiveness of the minimum moment metric was eliminated by merging it with the sum of the square metric. In addition, a fractional order resource distribution metric was proposed to dissuasively penalize peak resource demand. A comparison of resource distribution metrics for two case study problems revealed that the proposed three resource distribution metrics presented better resource distribution histograms with less fluctuations and peak resource demand. This study revealed the behavior and disadvantages of existing resource distribution metrics such that the schedulers can foresee the probable output of the metrics, which may assist them in implementing a proper metric. Moreover, the metrics developed in this study provided better resource histograms, which was the theoretical contribution of this study.

Authors

Institutions

Publication Details

Journal
Journal of Construction Engineering and Management
Published
2024-11-26
DOI
https://doi.org/10.1061/jcemd4.coeng-15085
Citations
2
Primary Topic
Resource-Constrained Project Scheduling
Type
article
Field-Weighted Citation Impact
0.98
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Analysis of Existing Resource Distribution Metrics and Suggestion of New Metrics

Önder Halis Bettemir
2 citations
Journal of Construction Engineering and Management
Resource-Constrained Project Scheduling
0.98
article

Analysis of Existing Resource Distribution Metrics and Suggestion of New Metrics

Önder Halis Bettemir
article en
2 citations

Abstract

Resource leveling aims to reduce peak resource demand and fluctuations in resource usage histograms throughout a construction period. The objective function optimum can be obtained in the digitalized construction management era. However, the correct quantification of uneven resource distribution is also essential because an improper resource distribution metric may even worsen the resource distribution. The behaviors of existing resource distribution metrics were not examined thoroughly in the literature. This study aims to improve existing resource distribution metrics and analyze the objective functions to identify their positive and negative aspects. Eight existing resource leveling metrics were analyzed by considering their responses to the peak resource demand and fluctuations in daily resource demand. The analysis uncovered that the existing metrics were insensitive to either resource fluctuations or peak resource demand. The time insensitiveness of the minimum moment metric was eliminated by merging it with the sum of the square metric. In addition, a fractional order resource distribution metric was proposed to dissuasively penalize peak resource demand. A comparison of resource distribution metrics for two case study problems revealed that the proposed three resource distribution metrics presented better resource distribution histograms with less fluctuations and peak resource demand. This study revealed the behavior and disadvantages of existing resource distribution metrics such that the schedulers can foresee the probable output of the metrics, which may assist them in implementing a proper metric. Moreover, the metrics developed in this study provided better resource histograms, which was the theoretical contribution of this study.

Journal of Construction Engineering and ManagementVol. 151(2)
Inonu University (TR)
Decent work and economic growth
Openalex Percentile: Top 20%
Resource-Constrained Project Scheduling
0.98
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.