Off-Site Construction Resilience: A Strategic Response to Inflation Challenges in Construction in Postpandemic Canada

The COVID-19 triggered a period of inflation in Canada, with the Consumer Price Index increasing by an average of 3.4% in 2021, followed by 6.8% in 2022, and 3.9% in 2023. This rising inflation presents significant challenges for the construction industry, which accounts for over 1.5 million jobs and more than 7% of the country's economic activity. Two years after the pandemic, the inflationary environment was characterized by high, persistent, and volatile rates and influenced by factors beyond the industry's control. One effective approach to address these issues is to identify high-risk inflationary materials and create a price index based on historical market prices. Such a strategy allows project teams to track fluctuations in material prices and adjust project cost estimate. Embracing innovative strategies such as digitalized off-site construction and industrialized building systems can enhance the construction industry's resilience in the face of persistent inflation. This paper examines the impact of inflation on construction project budgets and project costs. Correlation coefficient tests are used to analyze the relationship between inflation rates and building construction prices. The results indicate a 14% increase in the contract sum attributable to inflation, a factor that may result in cost overruns. The findings point to the benefits of adopting off-site construction techniques as a strategic solution aimed at specifically countering the detrimental effects of cost overruns resulting from material waste and project delays, factors that not only escalate project costs but also significantly amplify the adverse impact of inflation on the project budget.

Authors

Institutions

Publication Details

Journal
Journal of Architectural Engineering
Published
2024-11-26
DOI
https://doi.org/10.1061/jaeied.aeeng-1868
Citations
1
Primary Topic
Construction Project Management and Performance
Type
article
Field-Weighted Citation Impact
0.49
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Off-Site Construction Resilience: A Strategic Response to Inflation Challenges in Construction in Postpandemic Canada

Amirhossein Mehdipoor, Ivanka Iordanova, Mohamed Al‐Hussein
1 citations
Journal of Architectural Engineering
Construction Project Management and Performance
0.49
article

Off-Site Construction Resilience: A Strategic Response to Inflation Challenges in Construction in Postpandemic Canada

Amirhossein Mehdipoor, Ivanka Iordanova, Mohamed Al‐Hussein
article en
1 citations

Abstract

The COVID-19 triggered a period of inflation in Canada, with the Consumer Price Index increasing by an average of 3.4% in 2021, followed by 6.8% in 2022, and 3.9% in 2023. This rising inflation presents significant challenges for the construction industry, which accounts for over 1.5 million jobs and more than 7% of the country's economic activity. Two years after the pandemic, the inflationary environment was characterized by high, persistent, and volatile rates and influenced by factors beyond the industry's control. One effective approach to address these issues is to identify high-risk inflationary materials and create a price index based on historical market prices. Such a strategy allows project teams to track fluctuations in material prices and adjust project cost estimate. Embracing innovative strategies such as digitalized off-site construction and industrialized building systems can enhance the construction industry's resilience in the face of persistent inflation. This paper examines the impact of inflation on construction project budgets and project costs. Correlation coefficient tests are used to analyze the relationship between inflation rates and building construction prices. The results indicate a 14% increase in the contract sum attributable to inflation, a factor that may result in cost overruns. The findings point to the benefits of adopting off-site construction techniques as a strategic solution aimed at specifically countering the detrimental effects of cost overruns resulting from material waste and project delays, factors that not only escalate project costs but also significantly amplify the adverse impact of inflation on the project budget.

Journal of Architectural EngineeringVol. 31(1)
University of Alberta (CA), École de Technologie Supérieure (CA)
Climate action
Openalex Percentile: Top 29%
Construction Project Management and Performance
0.49
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.