Efisiensi Penggunaan CBC Calculator sebagai Alat Bantu Pengukuran Produktivitas Metode Crew Balance Chart

Work productivity in construction project operations is often measured using non-scientific methods due to the relatively short time required. Productivity is typically calculated based on daily production output, which is measured in the afternoon. One scientific method for measuring productivity is the Crew Balance Chart (CBC). This study aims to evaluate the efficiency that can be achieved through an Android-based application specifically designed to streamline data processing and reduce measurement time. The method used is a comparative analysis of productivity measurement duration by comparing standard CBC methods with the tools, using a tower crane operation as a case study. The findings reveal an efficiency increase of 142.1%. The use of the Android-based application reduced measurement duration by 1,11 hours, from 3,76 hours to 2,64 hours. It is important to note that the application assists only in the data processing stage, while data collection and analysis continue to follow standard CBC procedures.

Authors

Institutions

Publication Details

Journal
Journal of Infrastructure Policy and Management
Published
2024-11-20
DOI
https://doi.org/10.35166/jipm.v7i2.50
Primary Topic
Management and Optimization Techniques
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Efisiensi Penggunaan CBC Calculator sebagai Alat Bantu Pengukuran Produktivitas Metode Crew Balance Chart

Mubashir Aziz, Redityo Januardi, Muhammad Syaiful Aliim
Journal of Infrastructure Policy and Management
Management and Optimization Techniques
article

Efisiensi Penggunaan CBC Calculator sebagai Alat Bantu Pengukuran Produktivitas Metode Crew Balance Chart

Mubashir Aziz, Redityo Januardi, Muhammad Syaiful Aliim
article en

Abstract

Work productivity in construction project operations is often measured using non-scientific methods due to the relatively short time required. Productivity is typically calculated based on daily production output, which is measured in the afternoon. One scientific method for measuring productivity is the Crew Balance Chart (CBC). This study aims to evaluate the efficiency that can be achieved through an Android-based application specifically designed to streamline data processing and reduce measurement time. The method used is a comparative analysis of productivity measurement duration by comparing standard CBC methods with the tools, using a tower crane operation as a case study. The findings reveal an efficiency increase of 142.1%. The use of the Android-based application reduced measurement duration by 1,11 hours, from 3,76 hours to 2,64 hours. It is important to note that the application assists only in the data processing stage, while data collection and analysis continue to follow standard CBC procedures.

Journal of Infrastructure Policy and ManagementVol. 7(2)
Jenderal Soedirman University (ID)
Decent work and economic growth
Openalex Percentile: Top 63%
Management and Optimization Techniques
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Efisiensi Penggunaan CBC Calculator sebagai Alat Bantu Pengukuran Produktivitas Metode Crew Balance Chart — Mubashir Aziz, Redityo Januardi, et al. · Journal of Infrastructure Policy and Management (2024) | TGRS Research Map | TGRS