Rapid Treatment of Urban Initial Rainwater Runoff by A/O–Magnetic Flocculation Combined Process

The acceleration of urbanization with the increased proportion of impermeable surfaces has posed significant challenges for old urban drainage systems, particularly during periods of heavy rainfall. Urban initial rainwater runoff pollution, containing a considerable quantity of pollutants, has severely contaminated the urban water environment. The present study presented an A/O–magnetic flocculation (A/O-MF) process for the rapid treatment of urban initial rainwater runoff pollution to realize the simultaneous removal of NH4+-N, TN, COD, TP, and SSs. The optimal operation parameters were obtained by the single-factor and orthogonal methods. The results showed that the optimal operation duration of the A/O process was 10 min for the anoxic process and 60 min for the aerobic process. The optimal dosages of the flocculants were 105 mg/L for PAC, 3 mg/L for PAM, and 30 mg/L for Fe3O4 with a sedimentation time of 2 min. To treat the actual runoff rainwater, the A/O-MF process improved the removal efficiencies of TP, SSs, NH4+-N, and COD compared with the single A/O process, with efficiencies of 99.5%, 93.3%, 99.7%, and 91.3%, respectively. The total operation duration was only 74 min, which could enable the rapid and efficient treatment of urban runoff rainwater.

Authors

Institutions

Publication Details

Journal
Water
Published
2024-11-25
DOI
https://doi.org/10.3390/w16233392
Primary Topic
Water and Wastewater Treatment
Type
article
Field-Weighted Citation Impact
0.00

Funders

Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Rapid Treatment of Urban Initial Rainwater Runoff by A/O–Magnetic Flocculation Combined Process

Long Huang, Shaofeng Yan, Yuan Li, Yingke Fang et al.
Water
Water and Wastewater Treatment
article

Rapid Treatment of Urban Initial Rainwater Runoff by A/O–Magnetic Flocculation Combined Process

Long Huang, Shaofeng Yan, Yuan Li, Yingke Fang, Guoqiang Li, Jie Li, Hongbin Xu, Mingzhe Lv, Gangfu Song
article en

Abstract

The acceleration of urbanization with the increased proportion of impermeable surfaces has posed significant challenges for old urban drainage systems, particularly during periods of heavy rainfall. Urban initial rainwater runoff pollution, containing a considerable quantity of pollutants, has severely contaminated the urban water environment. The present study presented an A/O–magnetic flocculation (A/O-MF) process for the rapid treatment of urban initial rainwater runoff pollution to realize the simultaneous removal of NH4+-N, TN, COD, TP, and SSs. The optimal operation parameters were obtained by the single-factor and orthogonal methods. The results showed that the optimal operation duration of the A/O process was 10 min for the anoxic process and 60 min for the aerobic process. The optimal dosages of the flocculants were 105 mg/L for PAC, 3 mg/L for PAM, and 30 mg/L for Fe3O4 with a sedimentation time of 2 min. To treat the actual runoff rainwater, the A/O-MF process improved the removal efficiencies of TP, SSs, NH4+-N, and COD compared with the single A/O process, with efficiencies of 99.5%, 93.3%, 99.7%, and 91.3%, respectively. The total operation duration was only 74 min, which could enable the rapid and efficient treatment of urban runoff rainwater.

WaterVol. 16(23)
North China University of Water Resources and Electric Power (CN), Zhengzhou University (CN)
U.S. Department of Transportation, Henan Provincial Department of Transportation, Zhengzhou University, Division of Graduate Education
Sustainable cities and communities
Openalex Percentile: Top 77%
Water and Wastewater Treatment
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Rapid Treatment of Urban Initial Rainwater Runoff by A/O–Magnetic Flocculation Combined Process — Long Huang, Shaofeng Yan, et al. · Water (2024) | TGRS Research Map | TGRS