Reliability Assessment and Risk Analysis of Virtual Power Plant Scheduling with Diverse Load Aggregation

Receiving-end distribution networks are facing increasing scarcity of flexibility regulation resources, while virtual power plant (VPP) can effectively aggregate diverse loads such as central air-conditioning, electric vehicles and rooftop photovoltaic users to participate in the demand response, thus effectively improving the scheduling flexibility of the distribution network. Considering the uncertain response of the diverse load resources, the VPP scheduling decision model is established by using fuzzy chance constraint planning, and the response reliable capacity and response capacity reliability are defined to measure the VPP scheduling reliability. On this basis, the VPP scheduling risk assessment method is proposed based on fuzzy simulation technology, and then the scheduling risk is analyzed under different confidence levels and different penalty coefficients. The results validate the effectiveness of the proposed model and method.

Authors

Institutions

Publication Details

Published
2024-11-06
DOI
https://doi.org/10.1109/scems63294.2024.10756381
Citations
1
Primary Topic
Smart Grid and Power Systems
Type
article
Field-Weighted Citation Impact
0.21

Funders

Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Reliability Assessment and Risk Analysis of Virtual Power Plant Scheduling with Diverse Load Aggregation

Lei Gao, Yilin Jia, Yang Cao, Gao Xueheng et al.
1 citations
Smart Grid and Power Systems
0.21
article

Reliability Assessment and Risk Analysis of Virtual Power Plant Scheduling with Diverse Load Aggregation

Lei Gao, Yilin Jia, Yang Cao, Gao Xueheng, Wu Yanqiu
article en
1 citations

Abstract

Receiving-end distribution networks are facing increasing scarcity of flexibility regulation resources, while virtual power plant (VPP) can effectively aggregate diverse loads such as central air-conditioning, electric vehicles and rooftop photovoltaic users to participate in the demand response, thus effectively improving the scheduling flexibility of the distribution network. Considering the uncertain response of the diverse load resources, the VPP scheduling decision model is established by using fuzzy chance constraint planning, and the response reliable capacity and response capacity reliability are defined to measure the VPP scheduling reliability. On this basis, the VPP scheduling risk assessment method is proposed based on fuzzy simulation technology, and then the scheduling risk is analyzed under different confidence levels and different penalty coefficients. The results validate the effectiveness of the proposed model and method.

Shanghai Electric (China) (CN)
State Grid Liaoning Electric Power Supply Company
Affordable and clean energy
Openalex Percentile: Top 46%
Smart Grid and Power Systems
0.21
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.