Techno-economic optimization for BESS sizing and operation considering degradation and ramp rate limit requirement

In systems with significant renewable energy penetration, ramp rate limits are essential for maintaining grid frequency stability. Developing methodologies to manage this requirement is crucial for new power plant commissioning. This work proposes an optimization-based methodology for Battery Energy Storage Systems (BESS) sizing while meeting ramp rate requirements. A key concern with BESS is estimating its lifetime, so the proposed method includes degradation calculation as a main contribution. The methodology allows the evaluation of different scenarios, focusing on the importance of including degradation in BESS sizing, the technical requirements for meeting ramp rate limits, the assessment of various BESS technologies, and the exploration of different operating strategies, business cases, and market frameworks. These aspects are investigated using a hypothetical PV power plant based on solar data from southern Spain.

Authors

Publication Details

Journal
Journal of Energy Storage
Published
2024-11-24
DOI
https://doi.org/10.1016/j.est.2024.114631
Citations
5
Primary Topic
Advanced Battery Technologies Research
Type
article
Field-Weighted Citation Impact
1.02

Funders

Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Techno-economic optimization for BESS sizing and operation considering degradation and ramp rate limit requirement

Marc Cheah-Mañé, Oriol Gomis‐Bellmunt, Montserrat Montalà Palau
5 citations
Journal of Energy Storage
Advanced Battery Technologies Research
1.02
article

Techno-economic optimization for BESS sizing and operation considering degradation and ramp rate limit requirement

Marc Cheah-Mañé, Oriol Gomis‐Bellmunt, Montserrat Montalà Palau
article en
5 citations

Abstract

In systems with significant renewable energy penetration, ramp rate limits are essential for maintaining grid frequency stability. Developing methodologies to manage this requirement is crucial for new power plant commissioning. This work proposes an optimization-based methodology for Battery Energy Storage Systems (BESS) sizing while meeting ramp rate requirements. A key concern with BESS is estimating its lifetime, so the proposed method includes degradation calculation as a main contribution. The methodology allows the evaluation of different scenarios, focusing on the importance of including degradation in BESS sizing, the technical requirements for meeting ramp rate limits, the assessment of various BESS technologies, and the exploration of different operating strategies, business cases, and market frameworks. These aspects are investigated using a hypothetical PV power plant based on solar data from southern Spain.

Journal of Energy StorageVol. 105
European Commission, Institució Catalana de Recerca i Estudis Avançats, Ministerio de Ciencia e Innovación, Agencia Estatal de Investigación
Climate action
Openalex Percentile: Top 24%
Advanced Battery Technologies Research
1.02
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Techno-economic optimization for BESS sizing and operation considering degradation and ramp rate limit requirement — Marc Cheah-Mañé, Oriol Gomis‐Bellmunt, et al. · Journal of Energy Storage (2024) | TGRS Research Map | TGRS