Development of a prefabricated construction productivity estimation model through BIM and data augmentation processes

The accuracy of productivity estimates remains a significant challenge due to limited data availability. This research addresses the need for precise productivity estimation in construction by integrating data augmentation techniques, onsite time study data, and Building Information Modeling (BIM) for automated quantity take-offs and design complexity analysis of steel connections. By examining design complexity, the method provides productivity estimates for project zones, sequences, and individual components, improving overall production management. Four data augmentation techniques—normal noise, interpolation, clustering, and Bayesian Linear Regression—were evaluated to enhance time study data. The augmented dataset was used to train an Artificial Neural Network, validated through case studies. The study identified the normal noise method as the most effective, significantly improving time estimation accuracy. Specifically, the proposed approach yielded a 58%–71% enhancement over current industry estimates and a 2.1%–31.1% improvement compared to models without data augmentation. This research enables managers to optimize resource allocation and reduce potential project delays.

Authors

Institutions

Publication Details

Journal
Construction Management and Economics
Published
2024-11-23
DOI
https://doi.org/10.1080/01446193.2024.2431280
Citations
6
Primary Topic
BIM and Construction Integration
Type
article
Field-Weighted Citation Impact
1.59

Funders

Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Development of a prefabricated construction productivity estimation model through BIM and data augmentation processes

Alaeldin Suliman, Kamyab Aghajamali, Saeid Metvaei, Qian Chen et al.
6 citations
Construction Management and Economics
BIM and Construction Integration
1.59
article

Development of a prefabricated construction productivity estimation model through BIM and data augmentation processes

Alaeldin Suliman, Kamyab Aghajamali, Saeid Metvaei, Qian Chen, Zhen Lei
article en
6 citations

Abstract

The accuracy of productivity estimates remains a significant challenge due to limited data availability. This research addresses the need for precise productivity estimation in construction by integrating data augmentation techniques, onsite time study data, and Building Information Modeling (BIM) for automated quantity take-offs and design complexity analysis of steel connections. By examining design complexity, the method provides productivity estimates for project zones, sequences, and individual components, improving overall production management. Four data augmentation techniques—normal noise, interpolation, clustering, and Bayesian Linear Regression—were evaluated to enhance time study data. The augmented dataset was used to train an Artificial Neural Network, validated through case studies. The study identified the normal noise method as the most effective, significantly improving time estimation accuracy. Specifically, the proposed approach yielded a 58%–71% enhancement over current industry estimates and a 2.1%–31.1% improvement compared to models without data augmentation. This research enables managers to optimize resource allocation and reduce potential project delays.

Construction Management and EconomicsVol. 43(5)
University of New Brunswick (CA), University of British Columbia (CA), Northumbria University (GB), University of British Columbia, Okanagan Campus (CA)
Mitacs
Decent work and economic growth
Openalex Percentile: Top 18%
BIM and Construction Integration
1.59
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Development of a prefabricated construction productivity estimation model through BIM and data augmentation processes — Alaeldin Suliman, Kamyab Aghajamali, et al. · Construction Management and Economics (2024) | TGRS Research Map | TGRS