Investment Risk Management of Bulk LPG Transportation Station (SPBE) Construction Project In Sorong

The Sorong region is known as a natural gas producer in Indonesia, but the local community has not been able to enjoy the gas product, namely LPG, at the same price as on the island of Java or other regions. Investment opportunities to build SPBE in Sorong are very attractive and open very wide. This study aims to analyze the risks that can affect investment in the project. This study uses types and sources of data in the form of primary data in the form of opinions and experiences derived from the results of interviews and Forum Group Discussion (FGD). The results of the analysis showed that 3 sources of risk were in the very high category, 22 sources of risk were in the high category, 35 sources of risk were in the medium category, 13 sources of risk were in the low to medium category, and 10 sources of risk were in the low category. After being given recommendations for the risk control process, it is estimated that 2 risks are still in the high category and 7 other sources of risk have been successfully downgraded to the medium category. At the planning stage, it is necessary to pay attention to the lack of commitment to gas volume and supply. At the EPC stage, material delays due to community disturbances, land execution, and work accidents need to be dealt with seriously.

Authors

Institutions

Publication Details

Journal
Asian Journal of Social and Humanities
Published
2024-11-23
DOI
https://doi.org/10.59888/ajosh.v3i2.447
Primary Topic
Occupational Health and Safety Management
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Investment Risk Management of Bulk LPG Transportation Station (SPBE) Construction Project In Sorong

Siti Jahroh, Widodo Ramadyanto, Ichwal Irawadi
Asian Journal of Social and Humanities
Occupational Health and Safety Management
article

Investment Risk Management of Bulk LPG Transportation Station (SPBE) Construction Project In Sorong

Siti Jahroh, Widodo Ramadyanto, Ichwal Irawadi
article en

Abstract

The Sorong region is known as a natural gas producer in Indonesia, but the local community has not been able to enjoy the gas product, namely LPG, at the same price as on the island of Java or other regions. Investment opportunities to build SPBE in Sorong are very attractive and open very wide. This study aims to analyze the risks that can affect investment in the project. This study uses types and sources of data in the form of primary data in the form of opinions and experiences derived from the results of interviews and Forum Group Discussion (FGD). The results of the analysis showed that 3 sources of risk were in the very high category, 22 sources of risk were in the high category, 35 sources of risk were in the medium category, 13 sources of risk were in the low to medium category, and 10 sources of risk were in the low category. After being given recommendations for the risk control process, it is estimated that 2 risks are still in the high category and 7 other sources of risk have been successfully downgraded to the medium category. At the planning stage, it is necessary to pay attention to the lack of commitment to gas volume and supply. At the EPC stage, material delays due to community disturbances, land execution, and work accidents need to be dealt with seriously.

Asian Journal of Social and HumanitiesVol. 3(2)
IPB University (ID)
Openalex Percentile: Top 63%
Occupational Health and Safety Management
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Investment Risk Management of Bulk LPG Transportation Station (SPBE) Construction Project In Sorong — Siti Jahroh, Widodo Ramadyanto, et al. · Asian Journal of Social and Humanities (2024) | TGRS Research Map | TGRS