A Multi-Stage Rural Electrification Planning Method Considering Network Connectivity

Rural electrification planning plays a crucial role in advancing the grid connection transformation projects in rural areas. However, in the multi-stage expansion process of existing rural electrification planning, there is limited research on network connectivity. This lack of research leads to convergence issues with the phase angles of isolated nodes separated from the balance node. This paper proposes an artificial load demand method to construct anti-islanding constraints suitable for electrification planning. This approach ensures the connectivity of extension lines with the existing network. Based on optimizing the capacity allocation of wind and solar energy storage in off-grid microgrids, the optimal electrification scheme for unelectrified nodes is determined. The effectiveness of this method is validated through simulation case studies.

Authors

Institutions

Publication Details

Published
2024-09-12
DOI
https://doi.org/10.1109/ciced63421.2024.10753780
Primary Topic
Power Systems and Technologies
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

A Multi-Stage Rural Electrification Planning Method Considering Network Connectivity

Dexiang Li, Milu Zhou, Haifeng Xie, Zhijian Du et al.
Power Systems and Technologies
article

A Multi-Stage Rural Electrification Planning Method Considering Network Connectivity

Dexiang Li, Milu Zhou, Haifeng Xie, Zhijian Du, Huijie Sun
article en

Abstract

Rural electrification planning plays a crucial role in advancing the grid connection transformation projects in rural areas. However, in the multi-stage expansion process of existing rural electrification planning, there is limited research on network connectivity. This lack of research leads to convergence issues with the phase angles of isolated nodes separated from the balance node. This paper proposes an artificial load demand method to construct anti-islanding constraints suitable for electrification planning. This approach ensures the connectivity of extension lines with the existing network. Based on optimizing the capacity allocation of wind and solar energy storage in off-grid microgrids, the optimal electrification scheme for unelectrified nodes is determined. The effectiveness of this method is validated through simulation case studies.

China Southern Power Grid (China) (CN)
Sustainable cities and communities
Openalex Percentile: Top 81%
Power Systems and Technologies
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.