To enhance the economic performance of photovoltaic (PV) power stations within microgrids, a capacity planning method for PV power stations is conducted in conjunction with a full lifecycle assessment approach (LCA). Initially, a full lifecycle assessment method that can calculate the carbon emissions per unit PV capacity is proposed, and it is incorporated into the PV planning costs. To address the uncertainty of PV generation, a two-stage robust optimization model (TSROM) is used to optimize the PV capacity. The first stage minimizes the capacity investment costs and carbon emission costs, including the capacities of PV, ES, and diesel generators. The second stage, considering the uncertainty of PV generation, establishes a bi-level model to minimize operational costs under the most adverse conditions of PV generation. The case studies validate the effectiveness of the model and explore the impact of the PV carbon emission factor on PV capacity planning.

Authors

Institutions

Publication Details

Published
2024-09-12
DOI
https://doi.org/10.1109/ciced63421.2024.10754467
Primary Topic
Environmental Impact and Sustainability
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Robust Planning of Photovoltaic Power Stations Considering Carbon Emission Based on LCA

Wei Wei, Ye Li, Fan Li, Yingchun Wang et al.
Environmental Impact and Sustainability
article

Robust Planning of Photovoltaic Power Stations Considering Carbon Emission Based on LCA

Wei Wei, Ye Li, Fan Li, Yingchun Wang, He Yu, Li Ding
article en

Abstract

To enhance the economic performance of photovoltaic (PV) power stations within microgrids, a capacity planning method for PV power stations is conducted in conjunction with a full lifecycle assessment approach (LCA). Initially, a full lifecycle assessment method that can calculate the carbon emissions per unit PV capacity is proposed, and it is incorporated into the PV planning costs. To address the uncertainty of PV generation, a two-stage robust optimization model (TSROM) is used to optimize the PV capacity. The first stage minimizes the capacity investment costs and carbon emission costs, including the capacities of PV, ES, and diesel generators. The second stage, considering the uncertainty of PV generation, establishes a bi-level model to minimize operational costs under the most adverse conditions of PV generation. The case studies validate the effectiveness of the model and explore the impact of the PV carbon emission factor on PV capacity planning.

State Grid Corporation of China (China) (CN)
Openalex Percentile: Top 81%
Environmental Impact and Sustainability
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.