Research on Mechanized Construction Plan for Electrical Installation of 110kV Substation
In order to further implement the overall requirements of the “six perfections and four modernizations” of infrastructure proposed by State Grid Co., LTD., relying on the 110kV Guangxuan power transmission and transformation project to carry out the special design of mechanized construction, the paper studies the innovative scheme of mechanized construction of the main transformer, gas insulated metal closed switchgear, switchgear and secondary screen cabinet of typical substations. It lays the foundation for the comprehensive application of highly mechanized construction, and also provides technical support for low-carbon green construction.
Authors
- Wu Caofeng
Institutions
- Shanghai Electric (China) (CN)
Publication Details
- Published
- 2024-09-12
- DOI
- https://doi.org/10.1109/ciced63421.2024.10753768
- Primary Topic
- Power Systems and Technologies
- Type
- article
- Field-Weighted Citation Impact
- 0.00