This study investigates the effect of mechanization on the performance of construction workers in Kenya. It focuses on high-rise building projects in Nairobi County. The research employed a quantitative research strategy and a survey design, targeting construction site supervisors to collect data on the performance of construction workers (PCW) and mechanization levels (M) across various work categories including; Site Preparation and Earthworks (SPE), Scaffolding and Formwork (SF), Concreting (C), Walling (W), Plastering and Flooring (PF), Tiling and Painting (TP), and Building Services (BS). The performance of construction workers was measured based on two aspects, labour efficiency (LE) across the seven work categories, and labour effectiveness. Labour effectiveness was further broken down into two aspects, quality of work (QWo), and the extent of training and skillset development (TSD). The results of a correlation analysis between labour efficiency and mechanization indicate that out of the seven work categories, only Concreting demonstrated a statistically significant relationship (-0.189, p=0.045). The relationship was very weak and negative. Though this confirmed the hypothesized relationship between mechanization and labour efficiency, it can be argued that the effect of mechanization on the efficiency of construction workers in Kenya is almost non-existent. However, correlation analysis between mechanization and labour effectiveness demonstrated a positive correlation between mechanization and the training and skill development of workers. Results of the multiple regression showed a statistically significant effect of mechanization in SPE, SF, and Concreting works on PCW. The research findings suggest that while mechanization introduces challenges such as increased costs and skill requirements, it also necessitates strategic workforce planning to optimize productivity and worker welfare. The study contributes to understanding the dynamics between mechanization and labour performance in construction projects, emphasizing the need for effective labour management practices amid technological advancements in the modern era

Authors

Institutions

Publication Details

Journal
East African Journal of Engineering
Published
2024-11-22
DOI
https://doi.org/10.37284/eaje.7.1.2434
Primary Topic
Construction Project Management and Performance
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Effect of Mechanization on the Performance of Construction Workers in Kenya

Stephen Diang’a, Dennis Mumo Ndolo, Oswald Gwaya
East African Journal of Engineering
Construction Project Management and Performance
article

Effect of Mechanization on the Performance of Construction Workers in Kenya

Stephen Diang’a, Dennis Mumo Ndolo, Oswald Gwaya
article en

Abstract

This study investigates the effect of mechanization on the performance of construction workers in Kenya. It focuses on high-rise building projects in Nairobi County. The research employed a quantitative research strategy and a survey design, targeting construction site supervisors to collect data on the performance of construction workers (PCW) and mechanization levels (M) across various work categories including; Site Preparation and Earthworks (SPE), Scaffolding and Formwork (SF), Concreting (C), Walling (W), Plastering and Flooring (PF), Tiling and Painting (TP), and Building Services (BS). The performance of construction workers was measured based on two aspects, labour efficiency (LE) across the seven work categories, and labour effectiveness. Labour effectiveness was further broken down into two aspects, quality of work (QWo), and the extent of training and skillset development (TSD). The results of a correlation analysis between labour efficiency and mechanization indicate that out of the seven work categories, only Concreting demonstrated a statistically significant relationship (-0.189, p=0.045). The relationship was very weak and negative. Though this confirmed the hypothesized relationship between mechanization and labour efficiency, it can be argued that the effect of mechanization on the efficiency of construction workers in Kenya is almost non-existent. However, correlation analysis between mechanization and labour effectiveness demonstrated a positive correlation between mechanization and the training and skill development of workers. Results of the multiple regression showed a statistically significant effect of mechanization in SPE, SF, and Concreting works on PCW. The research findings suggest that while mechanization introduces challenges such as increased costs and skill requirements, it also necessitates strategic workforce planning to optimize productivity and worker welfare. The study contributes to understanding the dynamics between mechanization and labour performance in construction projects, emphasizing the need for effective labour management practices amid technological advancements in the modern era

East African Journal of EngineeringVol. 7(1)
Jomo Kenyatta University of Agriculture and Technology (KE)
Decent work and economic growth
Openalex Percentile: Top 74%
Construction Project Management and Performance
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.