Optimization Model for Mine Backfill Scheduling Under Multi-Resource Constraints

Addressing the resource constraints, such as manpower and equipment, faced by mine backfilling operations, this study proposed an optimization model for backfill scheduling based on the Resource-Constrained Project Scheduling Problem (RCPSP). The model considered backfilling’s multi-process, multi-task, and multi-resource characteristics, aiming to minimize total delay time. Constraints included operational limits, resource requirements, and availability. The goal was to determine optimal resource configurations for each stope’s backfilling steps. A heuristic genetic algorithm (GA) was employed for solution. To handle equipment unavailability, a new encoding/decoding algorithm ensured resource availability and continuous operations. Case verification using real mine data highlights the advantages of the model, showing a 20.6% decrease in completion time, an 8 percentage point improvement in resource utilization, and a 47.4% reduction in overall backfilling delay time compared to traditional methods. This work provides a reference for backfilling scheduling in similar mines and promotes intelligent mining practices.

Authors

Institutions

Publication Details

Journal
Minerals
Published
2024-11-21
DOI
https://doi.org/10.3390/min14121183
Citations
1
Primary Topic
Mining Techniques and Economics
Type
article
Field-Weighted Citation Impact
0.33

Funders

Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Optimization Model for Mine Backfill Scheduling Under Multi-Resource Constraints

Yuhang Liu, P. Patrick Wang, Chuan Tong, Jie Hou et al.
1 citations
Minerals
Mining Techniques and Economics
0.33
article

Optimization Model for Mine Backfill Scheduling Under Multi-Resource Constraints

Yuhang Liu, P. Patrick Wang, Chuan Tong, Jie Hou, Chunchao Fan, Guoqing Li
article en
1 citations

Abstract

Addressing the resource constraints, such as manpower and equipment, faced by mine backfilling operations, this study proposed an optimization model for backfill scheduling based on the Resource-Constrained Project Scheduling Problem (RCPSP). The model considered backfilling’s multi-process, multi-task, and multi-resource characteristics, aiming to minimize total delay time. Constraints included operational limits, resource requirements, and availability. The goal was to determine optimal resource configurations for each stope’s backfilling steps. A heuristic genetic algorithm (GA) was employed for solution. To handle equipment unavailability, a new encoding/decoding algorithm ensured resource availability and continuous operations. Case verification using real mine data highlights the advantages of the model, showing a 20.6% decrease in completion time, an 8 percentage point improvement in resource utilization, and a 47.4% reduction in overall backfilling delay time compared to traditional methods. This work provides a reference for backfilling scheduling in similar mines and promotes intelligent mining practices.

MineralsVol. 14(12)
National University of Singapore (SG), University of Science and Technology Beijing (CN)
National Natural Science Foundation of China, China Scholarship Council, National Key Research and Development Program of China
Decent work and economic growth
Openalex Percentile: Top 39%
Mining Techniques and Economics
0.33
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Optimization Model for Mine Backfill Scheduling Under Multi-Resource Constraints — Yuhang Liu, P. Patrick Wang, et al. · Minerals (2024) | TGRS Research Map | TGRS