Optimization Model for Mine Backfill Scheduling Under Multi-Resource Constraints
Addressing the resource constraints, such as manpower and equipment, faced by mine backfilling operations, this study proposed an optimization model for backfill scheduling based on the Resource-Constrained Project Scheduling Problem (RCPSP). The model considered backfilling’s multi-process, multi-task, and multi-resource characteristics, aiming to minimize total delay time. Constraints included operational limits, resource requirements, and availability. The goal was to determine optimal resource configurations for each stope’s backfilling steps. A heuristic genetic algorithm (GA) was employed for solution. To handle equipment unavailability, a new encoding/decoding algorithm ensured resource availability and continuous operations. Case verification using real mine data highlights the advantages of the model, showing a 20.6% decrease in completion time, an 8 percentage point improvement in resource utilization, and a 47.4% reduction in overall backfilling delay time compared to traditional methods. This work provides a reference for backfilling scheduling in similar mines and promotes intelligent mining practices.
Authors
- Yuhang Liu (ORCID: https://orcid.org/0000-0001-8841-001X)
- P. Patrick Wang
- Chuan Tong (ORCID: https://orcid.org/0000-0003-1383-5042)
- Jie Hou (ORCID: https://orcid.org/0000-0002-3280-4762)
- Chunchao Fan
- Guoqing Li (ORCID: https://orcid.org/0000-0001-6443-886X)
Institutions
- National University of Singapore (SG)
- University of Science and Technology Beijing (CN)
Publication Details
- Journal
- Minerals
- Published
- 2024-11-21
- DOI
- https://doi.org/10.3390/min14121183
- Citations
- 1
- Primary Topic
- Mining Techniques and Economics
- Type
- article
- Field-Weighted Citation Impact
- 0.33
Funders
- National Natural Science Foundation of China
- China Scholarship Council
- National Key Research and Development Program of China