An integrated risk prioritization and determination of activity-wise delay (IRPAD) framework for enhancing schedule management in tunnel projects

Purpose This study aims to develop a comprehensive framework for addressing delays in tunnel construction projects by leveraging predictable risk factors. Tunnel projects often encounter scheduling delays due to inherent complexities and uncertainties, necessitating a proactive approach to prevent project underperformance. Design/methodology/approach The integrated risk prioritization and determination of activity-wise delay (IRPAD) framework is divided into four phases: identification and prioritization of risk factors, determination of activity-wise risk coefficients using MCDM-based methodology, obtaining the critical risk path, and developing an activity-wise risk matrix. Fault tree analysis (FTA) and event tree analysis (ETA) are employed to determine activity-wise risk coefficients based on expert responses. Findings The framework’s applicability in Indian tunnel projects is demonstrated through a real-world case study with 95% validation accuracy. The IRPAD framework enhances the delay analysis process and facilitates the provision of effective activity-wise mitigation measures. Practical implications The IRPAD framework predicts delays in infrastructure projects thus enhancing resilience and sustainability, supporting SDGs 9 and 11. It can be applied to a wide range of construction projects to improve project performance. Originality/value This research introduces novel concepts such as the three fold activity-wise risk matrix and the critical risk path, contributing to the development of the IRPAD framework for delay reduction. This framework offers valuable insights to practitioners in the construction industry.

Authors

Institutions

Publication Details

Journal
Engineering Construction & Architectural Management
Published
2024-11-19
DOI
https://doi.org/10.1108/ecam-06-2024-0780
Citations
1
Primary Topic
Construction Project Management and Performance
Type
article
Field-Weighted Citation Impact
0.49
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

An integrated risk prioritization and determination of activity-wise delay (IRPAD) framework for enhancing schedule management in tunnel projects

Abhaysinha G. Shelake, Nivedita Gogate
1 citations
Engineering Construction & Architectural Management
Construction Project Management and Performance
0.49
article

An integrated risk prioritization and determination of activity-wise delay (IRPAD) framework for enhancing schedule management in tunnel projects

Abhaysinha G. Shelake, Nivedita Gogate
article en
1 citations

Abstract

Purpose This study aims to develop a comprehensive framework for addressing delays in tunnel construction projects by leveraging predictable risk factors. Tunnel projects often encounter scheduling delays due to inherent complexities and uncertainties, necessitating a proactive approach to prevent project underperformance. Design/methodology/approach The integrated risk prioritization and determination of activity-wise delay (IRPAD) framework is divided into four phases: identification and prioritization of risk factors, determination of activity-wise risk coefficients using MCDM-based methodology, obtaining the critical risk path, and developing an activity-wise risk matrix. Fault tree analysis (FTA) and event tree analysis (ETA) are employed to determine activity-wise risk coefficients based on expert responses. Findings The framework’s applicability in Indian tunnel projects is demonstrated through a real-world case study with 95% validation accuracy. The IRPAD framework enhances the delay analysis process and facilitates the provision of effective activity-wise mitigation measures. Practical implications The IRPAD framework predicts delays in infrastructure projects thus enhancing resilience and sustainability, supporting SDGs 9 and 11. It can be applied to a wide range of construction projects to improve project performance. Originality/value This research introduces novel concepts such as the three fold activity-wise risk matrix and the critical risk path, contributing to the development of the IRPAD framework for delay reduction. This framework offers valuable insights to practitioners in the construction industry.

Engineering Construction & Architectural ManagementVol. 33(1)
MIT World Peace University (IN)
Industry, innovation and infrastructure
Openalex Percentile: Top 29%
Construction Project Management and Performance
0.49
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

An integrated risk prioritization and determination of activity-wise delay (IRPAD) framework for enhancing schedule management in tunnel projects — Abhaysinha G. Shelake, Nivedita Gogate · Engineering Construction & Architectural Management (2024) | TGRS Research Map | TGRS