Intelligent Forecast Model for Project Cost in Guangdong Province Based on GA-BP Neural Network

Project cost forecasting is a complex and critical process, and it is of paramount importance for the successful implementation of engineering projects. Accurately forecasting project costs can help project managers and relevant decision-makers make informed decisions, thereby avoiding unnecessary cost overruns and time delays. Furthermore, accurately forecasting project costs can make important contributions to better controlling engineering costs, optimizing resource allocation, and reducing project risks. To establish a high-precision cost forecasting model for construction projects in Guangdong Province, based on case data of construction projects in Guangdong Province, this paper first uses the Analytic Hierarchy Process (AHP) to obtain the characteristic parameters that affect project costs. Then, a neural network training and testing dataset is constructed, and a genetic algorithm (GA) is used to optimize the initial weights and biases of the neural network. The GA-BP neural network is used to establish a cost forecasting model for construction projects in Guangdong Province. Finally, by using parameter sensitivity analysis theory, the importance of the characteristic values that affect the project cost is ranked, and the optimal direction for controlling the project cost is obtained. The results showed: (1) The determination coefficient between the forecasting and actual values of the project cost forecasting model based on the BP neural network testing set is 0.87. After GA optimization, the determination coefficient between the forecasting and actual values of the GA-BP neural network testing set is 0.94. The accuracy of the intelligent forecast model for construction project cost in Guangdong Province has been significantly improved after optimization through GA. (2) Based on sensitivity analysis of neural network parameters, the most significant factor affecting the cost of construction projects in Guangdong Province is the number of above-ground floors, followed by the main structure type, foundation structure, above-ground building area, total building area, underground building area, fortification intensity, and building height. The results of parameter sensitivity analysis indicate the direction for cost control in construction projects. The research results of this paper provide theoretical guidance for cost control in construction projects.

Authors

Institutions

Publication Details

Journal
Buildings
Published
2024-11-18
DOI
https://doi.org/10.3390/buildings14113668
Citations
3
Primary Topic
Industrial Technology and Control Systems
Type
article
Field-Weighted Citation Impact
0.98

Funders

Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Intelligent Forecast Model for Project Cost in Guangdong Province Based on GA-BP Neural Network

Haofeng Zheng, Changqing Li, Huiling Zhang, Xiao Yang et al.
3 citations
Buildings
Industrial Technology and Control Systems
0.98
article

Intelligent Forecast Model for Project Cost in Guangdong Province Based on GA-BP Neural Network

Haofeng Zheng, Changqing Li, Huiling Zhang, Xiao Yang, Zhuoyu Chen, Xu Xiaofu
article en
3 citations

Abstract

Project cost forecasting is a complex and critical process, and it is of paramount importance for the successful implementation of engineering projects. Accurately forecasting project costs can help project managers and relevant decision-makers make informed decisions, thereby avoiding unnecessary cost overruns and time delays. Furthermore, accurately forecasting project costs can make important contributions to better controlling engineering costs, optimizing resource allocation, and reducing project risks. To establish a high-precision cost forecasting model for construction projects in Guangdong Province, based on case data of construction projects in Guangdong Province, this paper first uses the Analytic Hierarchy Process (AHP) to obtain the characteristic parameters that affect project costs. Then, a neural network training and testing dataset is constructed, and a genetic algorithm (GA) is used to optimize the initial weights and biases of the neural network. The GA-BP neural network is used to establish a cost forecasting model for construction projects in Guangdong Province. Finally, by using parameter sensitivity analysis theory, the importance of the characteristic values that affect the project cost is ranked, and the optimal direction for controlling the project cost is obtained. The results showed: (1) The determination coefficient between the forecasting and actual values of the project cost forecasting model based on the BP neural network testing set is 0.87. After GA optimization, the determination coefficient between the forecasting and actual values of the GA-BP neural network testing set is 0.94. The accuracy of the intelligent forecast model for construction project cost in Guangdong Province has been significantly improved after optimization through GA. (2) Based on sensitivity analysis of neural network parameters, the most significant factor affecting the cost of construction projects in Guangdong Province is the number of above-ground floors, followed by the main structure type, foundation structure, above-ground building area, total building area, underground building area, fortification intensity, and building height. The results of parameter sensitivity analysis indicate the direction for cost control in construction projects. The research results of this paper provide theoretical guidance for cost control in construction projects.

BuildingsVol. 14(11)
Guangdong Ocean University (CN)
National Science Foundation, National Natural Science Foundation of China, Guangdong Ocean University
Industry, innovation and infrastructure
Openalex Percentile: Top 23%
Industrial Technology and Control Systems
0.98
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.