The Impact of the COVID-19 Pandemic on Work Productivity in Project X in Batam Using the Data Envelopment Analysis (DEA) Method

The development of 4.0 industry has a major influence on worldwide gas consumption. In order to meet the requirement, the gas producing company, such as Qatargas, performs expansion by building more offshore platforms on the fields. Qatargas’s infrastructure contructs by Project X that operating in Batam, Indonesia. The project X awarded by Qatargas to commence by the end of 2021. The scope of work includes engineering, procurement, construction, and installation (EPCI). During the construction, an unexpected even, COVID-19, occurred and caused a negative impact to the construction productivity. A non-parametric Data Envelopment Analysis (DEA) is utilized to measure performance trends with focus on project X daily progressing report from 2022 (during pandemic) until 2023 (post-pandemic). SWOT and PEST are utilised to analyse the improvement strategy by Project X. Efficiency measurement by DEA has 3 different variable, such as total employee, total welding made, and work pack issued, whereby the output is total manhours earned. This report also analyses six division of Decision-Making Unit (DMU). The research employs SWOT analysis to identify factors affecting project performance and strategies for efficiency improvement. Based on the analysis, there is no significant impact due to pandemic since PT X still could continue to perform fabrication while maintaining the required health protocol. The mean efficiency is 0,734 in 2022 and 0,656 in 2023. The project productivity declines by 0,078 because of declining efficiency parameter on Production Electrical dan Structural Quality Division. The efficiency improvement strategy for Project X includes optimizing the number of employees, minimizing rework, and daily monitoring of manhours earned to prevent inaccurate work hour claims.

Authors

Institutions

Publication Details

Journal
Journal of Applied Sciences Management and Engineering Technology
Published
2024-09-30
DOI
https://doi.org/10.31284/j.jasmet.2024.v5i2.6635
Primary Topic
Management and Optimization Techniques
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

The Impact of the COVID-19 Pandemic on Work Productivity in Project X in Batam Using the Data Envelopment Analysis (DEA) Method

Yohana Selliabreint Br Sembiring, Putu Artama Wiguna
Journal of Applied Sciences Management and Engineering Technology
Management and Optimization Techniques
article

The Impact of the COVID-19 Pandemic on Work Productivity in Project X in Batam Using the Data Envelopment Analysis (DEA) Method

Yohana Selliabreint Br Sembiring, Putu Artama Wiguna
article en

Abstract

The development of 4.0 industry has a major influence on worldwide gas consumption. In order to meet the requirement, the gas producing company, such as Qatargas, performs expansion by building more offshore platforms on the fields. Qatargas’s infrastructure contructs by Project X that operating in Batam, Indonesia. The project X awarded by Qatargas to commence by the end of 2021. The scope of work includes engineering, procurement, construction, and installation (EPCI). During the construction, an unexpected even, COVID-19, occurred and caused a negative impact to the construction productivity. A non-parametric Data Envelopment Analysis (DEA) is utilized to measure performance trends with focus on project X daily progressing report from 2022 (during pandemic) until 2023 (post-pandemic). SWOT and PEST are utilised to analyse the improvement strategy by Project X. Efficiency measurement by DEA has 3 different variable, such as total employee, total welding made, and work pack issued, whereby the output is total manhours earned. This report also analyses six division of Decision-Making Unit (DMU). The research employs SWOT analysis to identify factors affecting project performance and strategies for efficiency improvement. Based on the analysis, there is no significant impact due to pandemic since PT X still could continue to perform fabrication while maintaining the required health protocol. The mean efficiency is 0,734 in 2022 and 0,656 in 2023. The project productivity declines by 0,078 because of declining efficiency parameter on Production Electrical dan Structural Quality Division. The efficiency improvement strategy for Project X includes optimizing the number of employees, minimizing rework, and daily monitoring of manhours earned to prevent inaccurate work hour claims.

Journal of Applied Sciences Management and Engineering TechnologyVol. 5(2)
Institut Manajemen Koperasi Indonesia (ID)
Openalex Percentile: Top 64%
Management and Optimization Techniques
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.