Unveiling the complexity code: navigating BIM-enabled projects with a project management complexity index

Purpose This study aims to investigate the complexity factors associated with BIM-enabled projects. BIM has been widely promoted as a potential solution to numerous challenges that hinder productivity in construction projects, owing to its numerous advantages. Nevertheless, it is crucial to acknowledge the heightened complexity it introduces to project workflows, stakeholder coordination and information management. Design/methodology/approach This study employs the Delphi method to identify and extract complexity factors specific to BIM-enabled projects. A panel of industry and academic experts is engaged to discern and prioritise these factors based on their expertise and knowledge. Findings The study reveals a comprehensive list of 34 complexity factors that significantly impact BIM-enabled projects. Among the most influential factors are laws and regulations, variety of procurement methods, technical capabilities of teams, project manager competence, information transfer capacity, range of project deliverables and diversity of project locations. The findings highlight the importance of these factors and emphasise the need for proactive and adaptive management to navigate their impact and achieve positive project outcomes. Originality/value This study introduces the DEBACCS framework, a metric-based model designed to understand and evaluate complexity within BIM-enabled projects. DEBACCS stands for seven key dimensions: diversity, emergence, belonging, autonomy, connectivity, context and size. These dimensions represent essential aspects for gauging project complexity. By applying the concept of complexity from project management to BIM, the study offers valuable insights for practitioners and researchers. It provides a unique perspective on the challenges and considerations associated with implementing and managing BIM in construction projects. The findings have practical value for practitioners, enabling them to better understand and address the implications of complexity in BIM-enabled projects, ultimately leading to improved project outcomes.

Authors

Institutions

Publication Details

Journal
Engineering Construction & Architectural Management
Published
2024-11-18
DOI
https://doi.org/10.1108/ecam-07-2023-0702
Citations
3
Primary Topic
BIM and Construction Integration
Type
article
Field-Weighted Citation Impact
0.80
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Unveiling the complexity code: navigating BIM-enabled projects with a project management complexity index

Hamed Golzad, Javad Bakhshi, Eleni Papadonikolaki, Igor Martek et al.
3 citations
Engineering Construction & Architectural Management
BIM and Construction Integration
0.80
article

Unveiling the complexity code: navigating BIM-enabled projects with a project management complexity index

Hamed Golzad, Javad Bakhshi, Eleni Papadonikolaki, Igor Martek, M. Reza Hosseini
article en
3 citations

Abstract

Purpose This study aims to investigate the complexity factors associated with BIM-enabled projects. BIM has been widely promoted as a potential solution to numerous challenges that hinder productivity in construction projects, owing to its numerous advantages. Nevertheless, it is crucial to acknowledge the heightened complexity it introduces to project workflows, stakeholder coordination and information management. Design/methodology/approach This study employs the Delphi method to identify and extract complexity factors specific to BIM-enabled projects. A panel of industry and academic experts is engaged to discern and prioritise these factors based on their expertise and knowledge. Findings The study reveals a comprehensive list of 34 complexity factors that significantly impact BIM-enabled projects. Among the most influential factors are laws and regulations, variety of procurement methods, technical capabilities of teams, project manager competence, information transfer capacity, range of project deliverables and diversity of project locations. The findings highlight the importance of these factors and emphasise the need for proactive and adaptive management to navigate their impact and achieve positive project outcomes. Originality/value This study introduces the DEBACCS framework, a metric-based model designed to understand and evaluate complexity within BIM-enabled projects. DEBACCS stands for seven key dimensions: diversity, emergence, belonging, autonomy, connectivity, context and size. These dimensions represent essential aspects for gauging project complexity. By applying the concept of complexity from project management to BIM, the study offers valuable insights for practitioners and researchers. It provides a unique perspective on the challenges and considerations associated with implementing and managing BIM in construction projects. The findings have practical value for practitioners, enabling them to better understand and address the implications of complexity in BIM-enabled projects, ultimately leading to improved project outcomes.

Engineering Construction & Architectural ManagementVol. 32(11)
Deakin University (AU), The University of Melbourne (AU), University of South Australia (AU), University of Canberra (AU), Faculty of Design (SI), Delft University of Technology (NL)
Industry, innovation and infrastructure
Openalex Percentile: Top 28%
BIM and Construction Integration
0.80
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.