Design and Construction of Inductive Compensation for Extra-High-Voltage Transmission Line Models of Physical Laboratory of Electric Power Systems

The implementation of inductive compensation in the two-scale models of the extra-high-voltage transmission line, without and with transposition, of the Physical Laboratory of Electric Power Systems (PLEPS) is presented. As they have voltages above the normal operating range, for a situation like that of the real 500 kV Coca Codo Sinclair–El Inga lines in Ecuador, the problem was solved by incorporating parallel inductive reactors located at the ends of the lines. The fixed bus compensation used was carried out by means of three-phase inductors in star connection with neutral-to-ground voltage and built-in iron cores with pitches of 50, 75 and 100% of the design capacity.

Authors

Institutions

Publication Details

Published
2024-11-18
DOI
https://doi.org/10.3390/engproc2024077031
Primary Topic
Power Systems Fault Detection
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Design and Construction of Inductive Compensation for Extra-High-Voltage Transmission Line Models of Physical Laboratory of Electric Power Systems

Joseph Bryan G. Ibarra, Alberto Delgado, Anghelo Navarrete Cumbal
Power Systems Fault Detection
article

Design and Construction of Inductive Compensation for Extra-High-Voltage Transmission Line Models of Physical Laboratory of Electric Power Systems

Joseph Bryan G. Ibarra, Alberto Delgado, Anghelo Navarrete Cumbal
article en

Abstract

The implementation of inductive compensation in the two-scale models of the extra-high-voltage transmission line, without and with transposition, of the Physical Laboratory of Electric Power Systems (PLEPS) is presented. As they have voltages above the normal operating range, for a situation like that of the real 500 kV Coca Codo Sinclair–El Inga lines in Ecuador, the problem was solved by incorporating parallel inductive reactors located at the ends of the lines. The fixed bus compensation used was carried out by means of three-phase inductors in star connection with neutral-to-ground voltage and built-in iron cores with pitches of 50, 75 and 100% of the design capacity.

National Polytechnic School (EC)
Affordable and clean energy
Openalex Percentile: Top 76%
Power Systems Fault Detection
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.