Orlen may drop cracker plan

The Polish refiner and chemical maker Orlen is considering scrapping or scaling back its ethylene cracker project in Plock, Poland. The company unveiled the initiative in 2021, saying it planned to build 740,000 metric tons of ethylene capacity, as well as derivatives such as ethylene oxide. However, Orlen now projects that the current scope and scale of the project is unprofitable. It would cost as much as $12 billion to build and would be completed no sooner than 2030.

Authors

Publication Details

Journal
C&EN Global Enterprise
Published
2024-11-18
DOI
https://doi.org/10.1021/cen-10236-buscon8
Primary Topic
CO2 Sequestration and Geologic Interactions
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Orlen may drop cracker plan

Alex Tullo
C&EN Global Enterprise
CO2 Sequestration and Geologic Interactions
article

Orlen may drop cracker plan

Alex Tullo
article en

Abstract

The Polish refiner and chemical maker Orlen is considering scrapping or scaling back its ethylene cracker project in Plock, Poland. The company unveiled the initiative in 2021, saying it planned to build 740,000 metric tons of ethylene capacity, as well as derivatives such as ethylene oxide. However, Orlen now projects that the current scope and scale of the project is unprofitable. It would cost as much as $12 billion to build and would be completed no sooner than 2030.

C&EN Global EnterpriseVol. 102(36)
Openalex Percentile: Top 82%
CO2 Sequestration and Geologic Interactions
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Orlen may drop cracker plan — Alex Tullo · C&EN Global Enterprise (2024) | TGRS Research Map | TGRS