Analysis of Construction Project Cost and Time Using the Earned Value Method

This study aims to analyze the cost and time performance of the renovation project of Arwana Restaurant The Laguna Resort and Spa Nusa Dua by applying the Earned Value method. The data used in this study include the Cost Budget Plan (RAB), project implementation schedule, weekly project progress reports, and project expenditure reports. The calculation is done by calculating the value of ACWP (Actual Cost of Work Performed), BCWS (Budgeted Cost of Work Schedule), BCWP ( Budgeted Cost of Work Performed ), CV ( Cost Variance ), SV ( Schedule Variance ), CPI (Cost Performance Index), SPI (Schedule Performance Index), ETC (Estimate to Complete), ETS (Estimate Time to Complete), EAC (Estimate at Completion), and EAS (Estimate at Schedule). The results of the analysis show that at the beginning of the project the performance was good, but other things began to decline from the 11th week to the 23rd week. At the end of the project, performance improved again as indicated by a CPI value of 1.07 and an SPI of 1 indicating lower costs and time according to plan. The estimated total final project cost (EAC) of Rp2,947,878,984.57 was lower than the Cost Budget Plan (RAB) of Rp3,143,852,000, resulting in a profit of Rp195,973,015.43. The estimated total final project time (EAS) was in accordance with the planned schedule, which was 27 weeks. In conclusion, overall the project performance was quite good even though it had declined in the middle of the project implementation.

Authors

Publication Details

Journal
Communications on Applied Nonlinear Analysis
Published
2024-10-15
DOI
https://doi.org/10.52783/cana.v32.1963
Primary Topic
BIM and Construction Integration
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Analysis of Construction Project Cost and Time Using the Earned Value Method

Iwansyah Putra
Communications on Applied Nonlinear Analysis
BIM and Construction Integration
article

Analysis of Construction Project Cost and Time Using the Earned Value Method

Iwansyah Putra
article en

Abstract

This study aims to analyze the cost and time performance of the renovation project of Arwana Restaurant The Laguna Resort and Spa Nusa Dua by applying the Earned Value method. The data used in this study include the Cost Budget Plan (RAB), project implementation schedule, weekly project progress reports, and project expenditure reports. The calculation is done by calculating the value of ACWP (Actual Cost of Work Performed), BCWS (Budgeted Cost of Work Schedule), BCWP ( Budgeted Cost of Work Performed ), CV ( Cost Variance ), SV ( Schedule Variance ), CPI (Cost Performance Index), SPI (Schedule Performance Index), ETC (Estimate to Complete), ETS (Estimate Time to Complete), EAC (Estimate at Completion), and EAS (Estimate at Schedule). The results of the analysis show that at the beginning of the project the performance was good, but other things began to decline from the 11th week to the 23rd week. At the end of the project, performance improved again as indicated by a CPI value of 1.07 and an SPI of 1 indicating lower costs and time according to plan. The estimated total final project cost (EAC) of Rp2,947,878,984.57 was lower than the Cost Budget Plan (RAB) of Rp3,143,852,000, resulting in a profit of Rp195,973,015.43. The estimated total final project time (EAS) was in accordance with the planned schedule, which was 27 weeks. In conclusion, overall the project performance was quite good even though it had declined in the middle of the project implementation.

Communications on Applied Nonlinear AnalysisVol. 32(3)
Openalex Percentile: Top 78%
BIM and Construction Integration
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Analysis of Construction Project Cost and Time Using the Earned Value Method — Iwansyah Putra · Communications on Applied Nonlinear Analysis (2024) | TGRS Research Map | TGRS