Earthwork Network Architecture (ENA): Research for Earthwork Quantity Estimation Method Improvement with Large Language Model

Accurate earthwork quantity estimation is essential for effective project planning and cost management in the Architecture, Engineering, and Construction (AEC) industry. Traditional methods for quantity takeoff are often time-consuming and susceptible to human error, particularly when working with unstructured datasets such as CAD drawings. This study introduces the Earthwork Network Architecture (ENA), a novel deep learning framework that incorporates Large Language Models (LLMs), Multi-Layer Perceptron (MLP), Long Short-Term Memory (LSTM) networks, and Transformers to automate and enhance the accuracy of earthwork quantity estimation. We assume that if LLMs can be trained effectively using such unstructured construction dataset, the effects such as improved accuracy and the challenges of LLMs can be clearly examined. Among the architectures tested, the LLM-based ENA demonstrated superior performance, achieving faster convergence, greater loss reduction, and higher classification accuracy, with a Quantity Takeoff Classification accuracy of 97.17%. However, the LLMs required significantly more computational resources compared with other models. These findings suggest that LLMs, typically used in natural language processing, can be effectively adapted for complex AEC datasets. This study lays the groundwork for future AI-driven solutions in the AEC industry, underscoring the potential of LLMs and Transformers to automate the quantity takeoff process and manage multimodal data in construction projects.

Authors

Institutions

Publication Details

Journal
Applied Sciences
Published
2024-11-15
DOI
https://doi.org/10.3390/app142210517
Citations
8
Primary Topic
BIM and Construction Integration
Type
article
Field-Weighted Citation Impact
2.12
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Earthwork Network Architecture (ENA): Research for Earthwork Quantity Estimation Method Improvement with Large Language Model

Tae Wook Kang, Kyubyung Kang
8 citations
Applied Sciences
BIM and Construction Integration
2.12
article

Earthwork Network Architecture (ENA): Research for Earthwork Quantity Estimation Method Improvement with Large Language Model

Tae Wook Kang, Kyubyung Kang
article en
8 citations

Abstract

Accurate earthwork quantity estimation is essential for effective project planning and cost management in the Architecture, Engineering, and Construction (AEC) industry. Traditional methods for quantity takeoff are often time-consuming and susceptible to human error, particularly when working with unstructured datasets such as CAD drawings. This study introduces the Earthwork Network Architecture (ENA), a novel deep learning framework that incorporates Large Language Models (LLMs), Multi-Layer Perceptron (MLP), Long Short-Term Memory (LSTM) networks, and Transformers to automate and enhance the accuracy of earthwork quantity estimation. We assume that if LLMs can be trained effectively using such unstructured construction dataset, the effects such as improved accuracy and the challenges of LLMs can be clearly examined. Among the architectures tested, the LLM-based ENA demonstrated superior performance, achieving faster convergence, greater loss reduction, and higher classification accuracy, with a Quantity Takeoff Classification accuracy of 97.17%. However, the LLMs required significantly more computational resources compared with other models. These findings suggest that LLMs, typically used in natural language processing, can be effectively adapted for complex AEC datasets. This study lays the groundwork for future AI-driven solutions in the AEC industry, underscoring the potential of LLMs and Transformers to automate the quantity takeoff process and manage multimodal data in construction projects.

Applied SciencesVol. 14(22)
Purdue University West Lafayette (US), Korea Institute of Civil Engineering and Building Technology (KR)
Industry, innovation and infrastructure
Openalex Percentile: Top 14%
BIM and Construction Integration
2.12
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.