Patterns and causes of interference by stray currents from subways on buried pipelines

The interference section of a buried pipeline was evaluated for subway stray current interference. The long-term pipeline on/off potential at 40 test pile locations along the line was assessed using the coupon method. Additionally, at selected test pile locations, the pipeline-to-earth potential was measured simultaneously with the unidirectional conduction device current and track potential limiting device current on the rail side. The extent and pattern of pipeline interference were analyzed, and the practicality of interference evaluation was compared using the Chinese standard GB50991–2014 and the Australian standard AS2832.1–2015. The results indicate that for pipelines affected by subway direct current stray currents, when the subway stray current source is located at one end of the pipeline under study without crossing the pipeline, the sections at both ends of the pipeline are significantly impacted, serving as areas of stray current inflow and outflow. When the subway stray current source crosses the pipeline, the section near the crossing point is heavily affected, with areas of stray current inflow and outflow. This suggests that the stray current entering the ground through the vehicle's over-voltage protection device (OVPD) is the primary cause of significant interference on the pipeline.

Authors

Publication Details

Journal
Journal of dynamic disasters.
Published
2024-11-15
DOI
https://doi.org/10.1016/j.jdd.2024.100006
Primary Topic
Advanced Scientific and Engineering Studies
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Patterns and causes of interference by stray currents from subways on buried pipelines

Hequn Zou, Xuefeng Fang, Xiwen Liu, Yu Liang et al.
Journal of dynamic disasters.
Advanced Scientific and Engineering Studies
article

Patterns and causes of interference by stray currents from subways on buried pipelines

Hequn Zou, Xuefeng Fang, Xiwen Liu, Yu Liang, Jie Wu
article en

Abstract

The interference section of a buried pipeline was evaluated for subway stray current interference. The long-term pipeline on/off potential at 40 test pile locations along the line was assessed using the coupon method. Additionally, at selected test pile locations, the pipeline-to-earth potential was measured simultaneously with the unidirectional conduction device current and track potential limiting device current on the rail side. The extent and pattern of pipeline interference were analyzed, and the practicality of interference evaluation was compared using the Chinese standard GB50991–2014 and the Australian standard AS2832.1–2015. The results indicate that for pipelines affected by subway direct current stray currents, when the subway stray current source is located at one end of the pipeline under study without crossing the pipeline, the sections at both ends of the pipeline are significantly impacted, serving as areas of stray current inflow and outflow. When the subway stray current source crosses the pipeline, the section near the crossing point is heavily affected, with areas of stray current inflow and outflow. This suggests that the stray current entering the ground through the vehicle's over-voltage protection device (OVPD) is the primary cause of significant interference on the pipeline.

Journal of dynamic disasters.Vol. 1(2)
Sustainable cities and communities
Openalex Percentile: Top 75%
Advanced Scientific and Engineering Studies
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.