Suggesting Approximation and Exact Algorithms to Solve New Tri-Criteria Machine Scheduling Problems

This study presents the multi criteria single-machine model. The machine scheduling problem (MSP) for n tasks on a single machine involves minimizing a function of three criteria: total completion time (C_j), maximum earliest (E_max), and tardiness (〖ΣT〗_j), This is an NP-hard issue. Within this work's theoretical section, we present the mathematical formulation of The presented topic then highlights the usefulness of the dominance rule (DR), which may be used to develop effective solutions. While in the practical part, one of the important exact methods; The proposed MSP tricriteria are solved by applying the Branch and Bound (BAB) method, which finds a set of efficient solutions for 1//F(ΣC_j ,ΣT_j ,E_max) up to n=100 jobs. The BAB approach finds the efficient solutions for the issue in an acceptable amount of time. In addition, we provide two heuristic approaches to address the problem in order to obtain appropriate approximations. The two proposed approaches' good performance is demonstrated by the practical experiments.

Authors

Publication Details

Journal
Advances in Nonlinear Variational Inequalities
Published
2024-10-23
DOI
https://doi.org/10.52783/anvi.v28.2070
Primary Topic
Scheduling and Optimization Algorithms
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Suggesting Approximation and Exact Algorithms to Solve New Tri-Criteria Machine Scheduling Problems

M. Muter
Advances in Nonlinear Variational Inequalities
Scheduling and Optimization Algorithms
article

Suggesting Approximation and Exact Algorithms to Solve New Tri-Criteria Machine Scheduling Problems

M. Muter
article en

Abstract

This study presents the multi criteria single-machine model. The machine scheduling problem (MSP) for n tasks on a single machine involves minimizing a function of three criteria: total completion time (C_j), maximum earliest (E_max), and tardiness (〖ΣT〗_j), This is an NP-hard issue. Within this work's theoretical section, we present the mathematical formulation of The presented topic then highlights the usefulness of the dominance rule (DR), which may be used to develop effective solutions. While in the practical part, one of the important exact methods; The proposed MSP tricriteria are solved by applying the Branch and Bound (BAB) method, which finds a set of efficient solutions for 1//F(ΣC_j ,ΣT_j ,E_max) up to n=100 jobs. The BAB approach finds the efficient solutions for the issue in an acceptable amount of time. In addition, we provide two heuristic approaches to address the problem in order to obtain appropriate approximations. The two proposed approaches' good performance is demonstrated by the practical experiments.

Advances in Nonlinear Variational InequalitiesVol. 28(2)
Industry, innovation and infrastructure
Openalex Percentile: Top 71%
Scheduling and Optimization Algorithms
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.