PROCEDIMENTOS PARA EXECUCAO DE OBRAS NA REDE DE DISTRIBUICAO DA ENEL DISTRIBUICAO CEARA

This work presents the procedures necessary to carry out works in Enel's energy distribution network in the state of Ceará in order to provide quality and reliable product to the captive customer and for this, the partner company holding the contract for the execution of works must comply with the steps and procedures described in work instruction WKI-NDBR-DCE-18-0065-EDCE: Construction and Renovation of de-energized high and low voltage overhead lines. It begins by describing the basic operation of the high and low voltage power distribution systems in the state, such as the electrical configuration and voltage level of the primary and secondary networks. After that, the steps to carry out works in the distribution network are presented, as indicated in the aforementioned work instruction. Finally, a case study is presented in which a high voltage network extension work was carried out by the company B&Q Energia in the city of Santana do Acaraú, presenting all the steps carried out by the contractor obeying the work instruction.

Authors

Publication Details

Journal
Revista Científica Semana Acadêmica
Published
2024-11-12
DOI
https://doi.org/10.35265/2236-6717-252-13104
Primary Topic
Business and Management Studies
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

PROCEDIMENTOS PARA EXECUCAO DE OBRAS NA REDE DE DISTRIBUICAO DA ENEL DISTRIBUICAO CEARA

Cláudio Vinícius Cordiel Da Silva
Revista Científica Semana Acadêmica
Business and Management Studies
article

PROCEDIMENTOS PARA EXECUCAO DE OBRAS NA REDE DE DISTRIBUICAO DA ENEL DISTRIBUICAO CEARA

Cláudio Vinícius Cordiel Da Silva
article en

Abstract

This work presents the procedures necessary to carry out works in Enel's energy distribution network in the state of Ceará in order to provide quality and reliable product to the captive customer and for this, the partner company holding the contract for the execution of works must comply with the steps and procedures described in work instruction WKI-NDBR-DCE-18-0065-EDCE: Construction and Renovation of de-energized high and low voltage overhead lines. It begins by describing the basic operation of the high and low voltage power distribution systems in the state, such as the electrical configuration and voltage level of the primary and secondary networks. After that, the steps to carry out works in the distribution network are presented, as indicated in the aforementioned work instruction. Finally, a case study is presented in which a high voltage network extension work was carried out by the company B&Q Energia in the city of Santana do Acaraú, presenting all the steps carried out by the contractor obeying the work instruction.

Revista Científica Semana AcadêmicaVol. 12(252)
Affordable and clean energy
Openalex Percentile: Top 76%
Business and Management Studies
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.