PROCEDIMENTOS PARA EXECUCAO DE OBRAS NA REDE DE DISTRIBUICAO DA ENEL DISTRIBUICAO CEARA
This work presents the procedures necessary to carry out works in Enel's energy distribution network in the state of Ceará in order to provide quality and reliable product to the captive customer and for this, the partner company holding the contract for the execution of works must comply with the steps and procedures described in work instruction WKI-NDBR-DCE-18-0065-EDCE: Construction and Renovation of de-energized high and low voltage overhead lines. It begins by describing the basic operation of the high and low voltage power distribution systems in the state, such as the electrical configuration and voltage level of the primary and secondary networks. After that, the steps to carry out works in the distribution network are presented, as indicated in the aforementioned work instruction. Finally, a case study is presented in which a high voltage network extension work was carried out by the company B&Q Energia in the city of Santana do Acaraú, presenting all the steps carried out by the contractor obeying the work instruction.
Authors
- Cláudio Vinícius Cordiel Da Silva (ORCID: https://orcid.org/0009-0002-1572-2316)
Publication Details
- Journal
- Revista Científica Semana Acadêmica
- Published
- 2024-11-12
- DOI
- https://doi.org/10.35265/2236-6717-252-13104
- Primary Topic
- Business and Management Studies
- Type
- article
- Field-Weighted Citation Impact
- 0.00