Construction Materials Waste Management Practices on Ajima Chacha Mega Irrigation Projects in North Shewa, Ethiopia

Efficient material management is essential to have productive and cost efficient construction site. This paper aims to investigate the cause of construction material wastage in Ajima Chacha Mega irrigation projects, north Ethiopia. A questionnaire survey study with interview was used to explore construction materials management practices. Thirty three questionnaires were distributed to project managers, project engineers, site engineers, office engineer, and contract administration for the research. The construction material management practice in Ajima Chacha mega irrigation project is found poorly performed. Poor material handling and storage by contractors is the main cause of the construction material wastage in Ajima Chacha Mega project construction sites.

Authors

Publication Details

Journal
Journal of architecture and civil engineering.
Published
2024-10-01
DOI
https://doi.org/10.35629/8193-09100116
Primary Topic
Hydropower, Displacement, Environmental Impact
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Construction Materials Waste Management Practices on Ajima Chacha Mega Irrigation Projects in North Shewa, Ethiopia

Mitchell Adam, Shumet Getahun Reda
Journal of architecture and civil engineering.
Hydropower, Displacement, Environmental Impact
article

Construction Materials Waste Management Practices on Ajima Chacha Mega Irrigation Projects in North Shewa, Ethiopia

Mitchell Adam, Shumet Getahun Reda
article en

Abstract

Efficient material management is essential to have productive and cost efficient construction site. This paper aims to investigate the cause of construction material wastage in Ajima Chacha Mega irrigation projects, north Ethiopia. A questionnaire survey study with interview was used to explore construction materials management practices. Thirty three questionnaires were distributed to project managers, project engineers, site engineers, office engineer, and contract administration for the research. The construction material management practice in Ajima Chacha mega irrigation project is found poorly performed. Poor material handling and storage by contractors is the main cause of the construction material wastage in Ajima Chacha Mega project construction sites.

Journal of architecture and civil engineering.Vol. 9(10)
Openalex Percentile: Top 68%
Hydropower, Displacement, Environmental Impact
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.