Validation of a methodology for post-construction Energy Yield Assessment of an operational wind farm
The uncertainty associated with the prospective Energy Yield Assessment (EYA) of a wind farm may be reduced by re-estimating the energy yield after it enters normal operation. This study aims to validate a simple methodology for conducting post-construction EYA of an operational wind farm. The proposed methodology derives a linear relationship between a historical source of wind speed data and the observed wind farm production on a monthly basis.In the first stage, the impact of different data sources on the accuracy of the Long-Term energy yield estimate was assessed. Results suggest that the determination coefficient R is a reliable indicator for selecting the most adequate source of historical wind speed data to be used in the Long-Term energy yield estimate.In the second stage, the model was validated from a statistical point of view by testing the premises of the linear regression model, namely the significance of the linear correlation (ANOVA test), and the normally-distributed (Shapiro-Wilk test), non-self-correlated (Durbin-Watson), and homoscedastic (Breusch-Pagan test) residuals. Results show these premises are verified for most test cases, indicating that the model is statistically robust for most test cases.
Authors
- Marcos Heil Costa (ORCID: https://orcid.org/0000-0001-6874-9315)
- Pedro Pinto
- R. Pilão
- Jorge Souza Mendonça
- Thiago Lopes Rocha (ORCID: https://orcid.org/0000-0003-0551-6842)
Institutions
- Instituto Superior de Contabilidade e Administracao do Porto (PT)
- Águas de Portugal (Portugal) (PT)
- INESC TEC (PT)
- Polytechnic Institute of Porto (PT)
Publication Details
- Journal
- Renewable Energy and Power Quality Journal
- Published
- 2024-11-13
- DOI
- https://doi.org/10.52152/4118
- Primary Topic
- Vehicle emissions and performance
- Type
- article
- Field-Weighted Citation Impact
- 0.00