Traffic Impact Analysis Due to Construction of Special Eye Hospital Padang Eye Center

Padang Eye Center is one of the hospitals under construction on Jalan Khatib Sulaiman, Lolong Belanti, North Padang District, Padang City, West Sumatra. The construction of the hospital will certainly have an impact on traffic on Jalan Khatib Sulaiman. The purpose of conducting andalalin is to analyze the amount of travel demand that occurs at the Padang Eye Center Hospital in pre-construction, construction period, operational period, and post 5 years of construction, as well as seeing the impacts that occur and how alternative solutions are carried out. The parameters used are based on the Regulation of the Minister of Transportation of the Republic of Indonesia Number 17 of 2021 concerning the implementation of andalalin, the Indonesian Road Capacity Guidelines (PKJI) of 2023 concerning the performance of road sections and the Directorate General of Land Transportation of 1996 concerning parking. The results of the analysis, namely the existing conditions obtained a V / C ratio of 0.43 level B, the construction period obtained a V / C ratio of 0.45 level C, the operational period with a V / C ratio of 0.45 level C, and after 5 years of operation the V / C ratio is 0.58 level C which means that the flow is stable, but the operating speed begins to be limited based on the level of service (LOS) table. Parking needs based on the building area of 2832 m2 were obtained as many as 113 srp, while based on the available parking area it can accommodate as many as 121 srp, so the parking space requirements of the Padang Eye Center Special Eye Hospital have been met. The alternative solution to this analysis is the placement of regulatory officers in front of the entrance and exit of the Khatib Sulaiman Road intersection during the construction period, regulating parking circulation within the hospital area, and making barrier gates to regulate vehicle traffic flow.

Authors

Institutions

Publication Details

Journal
CIVED
Published
2024-09-30
DOI
https://doi.org/10.24036/cived.v11i3.547
Primary Topic
Urban Transport Systems Analysis
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Traffic Impact Analysis Due to Construction of Special Eye Hospital Padang Eye Center

Angelalia Roza, Wilton Wahab, Aisyah Ranjani
CIVED
Urban Transport Systems Analysis
article

Traffic Impact Analysis Due to Construction of Special Eye Hospital Padang Eye Center

Angelalia Roza, Wilton Wahab, Aisyah Ranjani
article en

Abstract

Padang Eye Center is one of the hospitals under construction on Jalan Khatib Sulaiman, Lolong Belanti, North Padang District, Padang City, West Sumatra. The construction of the hospital will certainly have an impact on traffic on Jalan Khatib Sulaiman. The purpose of conducting andalalin is to analyze the amount of travel demand that occurs at the Padang Eye Center Hospital in pre-construction, construction period, operational period, and post 5 years of construction, as well as seeing the impacts that occur and how alternative solutions are carried out. The parameters used are based on the Regulation of the Minister of Transportation of the Republic of Indonesia Number 17 of 2021 concerning the implementation of andalalin, the Indonesian Road Capacity Guidelines (PKJI) of 2023 concerning the performance of road sections and the Directorate General of Land Transportation of 1996 concerning parking. The results of the analysis, namely the existing conditions obtained a V / C ratio of 0.43 level B, the construction period obtained a V / C ratio of 0.45 level C, the operational period with a V / C ratio of 0.45 level C, and after 5 years of operation the V / C ratio is 0.58 level C which means that the flow is stable, but the operating speed begins to be limited based on the level of service (LOS) table. Parking needs based on the building area of 2832 m2 were obtained as many as 113 srp, while based on the available parking area it can accommodate as many as 121 srp, so the parking space requirements of the Padang Eye Center Special Eye Hospital have been met. The alternative solution to this analysis is the placement of regulatory officers in front of the entrance and exit of the Khatib Sulaiman Road intersection during the construction period, regulating parking circulation within the hospital area, and making barrier gates to regulate vehicle traffic flow.

CIVEDVol. 11(3)
Institut Teknologi Padang (ID)
Sustainable cities and communities
Openalex Percentile: Top 77%
Urban Transport Systems Analysis
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.