Planning, Monitoring and Replanning Techniques for Handling Abnormity in HTN-Based Planning and Execution

A framework that integrates planning, monitoring and replanning techniques is proposed. It can devise the best solution based on the current state according to specific objectives and properly deal with the influence of abnormity on the plan execution. The framework consists of three parts: the hierarchical task network (HTN) planner based on Monte Carlo tree search (MCTS), hybrid plan monitoring based on forward and backward and norm-based replanning method selection. The HTN planner based on MCTS selects the optimal method for HTN compound task through pre-exploration. Based on specific objectives, it can identify the best solution to the current problem. The hybrid plan monitoring has the capability to detect the influence of abnormity on the effect of an executed action and the premise of an unexecuted action, thus trigger the replanning. The norm-based replanning selection method can measure the difference between the expected state and the actual state, and then select the best replanning algorithm. The experimental results reveal that our method can effectively deal with the influence of abnormity on the implementation of the plan and achieve the target task in an optimal way.

Authors

Institutions

Publication Details

Journal
Journal of Systems Engineering and Electronics
Published
2024-10-01
DOI
https://doi.org/10.23919/jsee.2024.000090
Primary Topic
Distributed and Parallel Computing Systems
Type
article
Field-Weighted Citation Impact
0.00

Funders

Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Planning, Monitoring and Replanning Techniques for Handling Abnormity in HTN-Based Planning and Execution

Kai Cheng, T. Shao, Hongjun Zhang, Kai Kang et al.
Journal of Systems Engineering and Electronics
Distributed and Parallel Computing Systems
article

Planning, Monitoring and Replanning Techniques for Handling Abnormity in HTN-Based Planning and Execution

Kai Cheng, T. Shao, Hongjun Zhang, Kai Kang, Ke Zhang
article en

Abstract

A framework that integrates planning, monitoring and replanning techniques is proposed. It can devise the best solution based on the current state according to specific objectives and properly deal with the influence of abnormity on the plan execution. The framework consists of three parts: the hierarchical task network (HTN) planner based on Monte Carlo tree search (MCTS), hybrid plan monitoring based on forward and backward and norm-based replanning method selection. The HTN planner based on MCTS selects the optimal method for HTN compound task through pre-exploration. Based on specific objectives, it can identify the best solution to the current problem. The hybrid plan monitoring has the capability to detect the influence of abnormity on the effect of an executed action and the premise of an unexecuted action, thus trigger the replanning. The norm-based replanning selection method can measure the difference between the expected state and the actual state, and then select the best replanning algorithm. The experimental results reveal that our method can effectively deal with the influence of abnormity on the implementation of the plan and achieve the target task in an optimal way.

Journal of Systems Engineering and ElectronicsVol. 35(5)
National University of Defense Technology (CN), PLA Army Engineering University (CN)
National Natural Science Foundation of China
Openalex Percentile: Top 77%
Distributed and Parallel Computing Systems
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.