160 kW beam commissioning for the Rapid Cycling Synchrotron of the China Spallation Neutron Source

Abstract For the China Spallation Neutron Source (CSNS), the rapid cycling synchrotron (RCS) accumulates and accelerates the injection beam to the design energy of 1.6 GeV and then extracts the high energy beam to the target. In this paper, the 160 kW beam power commissioning for the CSNS RCS has been comprehensively studied, including: increase in the pulse width of the injection beam to optimize the transverse painting, commissioning of the two dual harmonic radio frequency (RF) cavities, optimization of the transverse and momentum collimators, longitudinal dynamic optimization, beam instability suppression, global closed orbit correction, local closed orbit correction, optimization of the RCS occasional large beam loss, optimization of the extraction mode and extraction occasional large beam loss, and so on. In order to meet the requirements of beam power increase and stable operation of the accelerator, the RCS beam losses from different sources are studied and optimized. With the aid of weekly radiation dose measurement, the hot spots of the RCS are studied in depth to explore the causes.

Authors

Institutions

Publication Details

Journal
Journal of Instrumentation
Published
2024-11-01
DOI
https://doi.org/10.1088/1748-0221/19/11/t11005
Primary Topic
Particle accelerators and beam dynamics
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

160 kW beam commissioning for the Rapid Cycling Synchrotron of the China Spallation Neutron Source

Xiaohan Lu, Yuwen An, Shouyan Xu, Y. S. Yuan et al.
Journal of Instrumentation
Particle accelerators and beam dynamics
article

160 kW beam commissioning for the Rapid Cycling Synchrotron of the China Spallation Neutron Source

Xiaohan Lu, Yuwen An, Shouyan Xu, Y. S. Yuan, Ming-Yang Huang, Yong Li, Sheng Wang, Zhiping Li, Y. L. Han, Yue Yuan, Hanyang Liu, Jun Peng, L. Huang, Kai Zhou, Jianliang Chen
article en

Abstract

Abstract For the China Spallation Neutron Source (CSNS), the rapid cycling synchrotron (RCS) accumulates and accelerates the injection beam to the design energy of 1.6 GeV and then extracts the high energy beam to the target. In this paper, the 160 kW beam power commissioning for the CSNS RCS has been comprehensively studied, including: increase in the pulse width of the injection beam to optimize the transverse painting, commissioning of the two dual harmonic radio frequency (RF) cavities, optimization of the transverse and momentum collimators, longitudinal dynamic optimization, beam instability suppression, global closed orbit correction, local closed orbit correction, optimization of the RCS occasional large beam loss, optimization of the extraction mode and extraction occasional large beam loss, and so on. In order to meet the requirements of beam power increase and stable operation of the accelerator, the RCS beam losses from different sources are studied and optimized. With the aid of weekly radiation dose measurement, the hot spots of the RCS are studied in depth to explore the causes.

Journal of InstrumentationVol. 19(11)
Chinese Academy of Sciences (CN), China Spallation Neutron Source (CN), Institute of High Energy Physics (CN), University of Chinese Academy of Sciences (CN)
Affordable and clean energy
Openalex Percentile: Top 68%
Particle accelerators and beam dynamics
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.