Analysis of the Causes of Deviations in the Implementation of Construction Work Contracts Based on Verdict

Construction Work is the whole or part of the activities that include the construction, operation, maintenance, demolition, and rebuilding that are regulated in a Construction Contract. In the implementation of the Construction Contract, several problems cause deviations. The purpose of this research is to analyze the causes of deviations in a Construction Contract based on Verdict. The research data was obtained from the Supreme Court Repository page by searching for Verdict related to implementing Construction Contracts. The limitation of this research is a case that has been decided in the last 10 years in the District Court in West Sumatra. The search results obtained 9 verdicts. The method used to analyze the data is the Rich Picture Diagram (RPD). Validation and refinement are carried out using the Interview method from the results of secondary data analysis. The outcome of this research is the causes of deviations that are prejudicial to one of the parties and thus fall under civil law such as The occurrence of delays caused by: Contractor negligence during implementation, Contractor achievements not paid by the Owner, negligence of the Planner Consultant, the state of the land is not by the drawing plan, continuous heavy rain that disrupts the work, Kurs strengthen sharply, land acquisition has not been completed by the Owner, the Contractor is not given the opportunity 50 days of completion; Disputes caused by: Owner made unilateral changes to Technical Specifications, Supervisory Consultant's mistake in reporting progress.

Authors

Institutions

Publication Details

Journal
CIVED
Published
2024-09-30
DOI
https://doi.org/10.24036/cived.v11i3.641
Primary Topic
Engineering and Environmental Studies
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Analysis of the Causes of Deviations in the Implementation of Construction Work Contracts Based on Verdict

Taufika Ophiyandri, Benny Hidayat, Qorri ‘Ainaqi
CIVED
Engineering and Environmental Studies
article

Analysis of the Causes of Deviations in the Implementation of Construction Work Contracts Based on Verdict

Taufika Ophiyandri, Benny Hidayat, Qorri ‘Ainaqi
article en

Abstract

Construction Work is the whole or part of the activities that include the construction, operation, maintenance, demolition, and rebuilding that are regulated in a Construction Contract. In the implementation of the Construction Contract, several problems cause deviations. The purpose of this research is to analyze the causes of deviations in a Construction Contract based on Verdict. The research data was obtained from the Supreme Court Repository page by searching for Verdict related to implementing Construction Contracts. The limitation of this research is a case that has been decided in the last 10 years in the District Court in West Sumatra. The search results obtained 9 verdicts. The method used to analyze the data is the Rich Picture Diagram (RPD). Validation and refinement are carried out using the Interview method from the results of secondary data analysis. The outcome of this research is the causes of deviations that are prejudicial to one of the parties and thus fall under civil law such as The occurrence of delays caused by: Contractor negligence during implementation, Contractor achievements not paid by the Owner, negligence of the Planner Consultant, the state of the land is not by the drawing plan, continuous heavy rain that disrupts the work, Kurs strengthen sharply, land acquisition has not been completed by the Owner, the Contractor is not given the opportunity 50 days of completion; Disputes caused by: Owner made unilateral changes to Technical Specifications, Supervisory Consultant's mistake in reporting progress.

CIVEDVol. 11(3)
Andalas University (ID)
Peace, Justice and strong institutions
Openalex Percentile: Top 73%
Engineering and Environmental Studies
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Analysis of the Causes of Deviations in the Implementation of Construction Work Contracts Based on Verdict — Taufika Ophiyandri, Benny Hidayat, et al. · CIVED (2024) | TGRS Research Map | TGRS