EFFECT OF PUBLIC PRIVATE PARTNERSHIP FINANCING STRUCTURE ON COMPLETION OF GEOTHERMAL ENERGY DEVELOPMENT PROJECTS IN KENYA

Objective: To determine the effect of Public Private Partnership (PPP) financing structure on the completion of geothermal energy development projects in Kenya. Theoretical Framework: The study used agency and public choice theories to analyze the dynamics between PPP financing structure and completion of geothermal energy development projects. Methodology: A cross-sectional census survey in Kenya surveyed 48 geothermal energy development projects, collecting quantitative data through structured questionnaires and qualitative insights from industry regulators, financiers, and practitioners. A combination of descriptive, correlation, and linear regression statistical models were applied. Multiple diagnostics tests and data triangulation were performed. Results and Discussion: The study results provide strong statistical evidence depicting a positive relationship between PPP financing structure and the completion of geothermal energy development projects in Kenya. The findings suggest that as the level of PPP involvement increases, so does the likelihood of faster project completion. The study also reveals that a balanced PPP financing structure has a substantial effect on the completion of geothermal energy development projects. The analysis demonstrates that a hybrid PPP financing structure comprising recommended proportions of private and government equity, commercial and concessional loans, hybrid finance, and grants significantly affects project completion outcomes. Research Implications: The study emphasizes the significance of a structured PPP financing model, comprising private and government equity, concessional and commercial loans, hybrid finance, and mixed grants, in mitigating inherent PPP risks for enhanced project completion outcomes. In addition, effective government support measures and robust delivery capability of developers jointly influence the two variables in a significant manner. Originality/Value: This study uniquely analyzes the influence of PPP financing structure on the completion of geothermal energy development projects in Kenya, integrating quantitative and qualitative data for a comprehensive perspective, thus offering essential insights for stakeholders.

Authors

Publication Details

Journal
International Journal of Professional Business Review
Published
2024-11-12
DOI
https://doi.org/10.26668/businessreview/2024.v9i11.5048
Citations
3
Primary Topic
Community Development and Social Impact
Type
article
Field-Weighted Citation Impact
1.62
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

EFFECT OF PUBLIC PRIVATE PARTNERSHIP FINANCING STRUCTURE ON COMPLETION OF GEOTHERMAL ENERGY DEVELOPMENT PROJECTS IN KENYA

Mary Nyawira Mwenda, Reuben Wambua Kikwatha, Charles Mallans Rambo, Sitati Olando
3 citations
International Journal of Professional Business Review
Community Development and Social Impact
1.62
article

EFFECT OF PUBLIC PRIVATE PARTNERSHIP FINANCING STRUCTURE ON COMPLETION OF GEOTHERMAL ENERGY DEVELOPMENT PROJECTS IN KENYA

Mary Nyawira Mwenda, Reuben Wambua Kikwatha, Charles Mallans Rambo, Sitati Olando
article en
3 citations

Abstract

Objective: To determine the effect of Public Private Partnership (PPP) financing structure on the completion of geothermal energy development projects in Kenya. Theoretical Framework: The study used agency and public choice theories to analyze the dynamics between PPP financing structure and completion of geothermal energy development projects. Methodology: A cross-sectional census survey in Kenya surveyed 48 geothermal energy development projects, collecting quantitative data through structured questionnaires and qualitative insights from industry regulators, financiers, and practitioners. A combination of descriptive, correlation, and linear regression statistical models were applied. Multiple diagnostics tests and data triangulation were performed. Results and Discussion: The study results provide strong statistical evidence depicting a positive relationship between PPP financing structure and the completion of geothermal energy development projects in Kenya. The findings suggest that as the level of PPP involvement increases, so does the likelihood of faster project completion. The study also reveals that a balanced PPP financing structure has a substantial effect on the completion of geothermal energy development projects. The analysis demonstrates that a hybrid PPP financing structure comprising recommended proportions of private and government equity, commercial and concessional loans, hybrid finance, and grants significantly affects project completion outcomes. Research Implications: The study emphasizes the significance of a structured PPP financing model, comprising private and government equity, concessional and commercial loans, hybrid finance, and mixed grants, in mitigating inherent PPP risks for enhanced project completion outcomes. In addition, effective government support measures and robust delivery capability of developers jointly influence the two variables in a significant manner. Originality/Value: This study uniquely analyzes the influence of PPP financing structure on the completion of geothermal energy development projects in Kenya, integrating quantitative and qualitative data for a comprehensive perspective, thus offering essential insights for stakeholders.

International Journal of Professional Business ReviewVol. 9(11)
Partnerships for the goals
Openalex Percentile: Top 15%
Community Development and Social Impact
1.62
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.