Research on Wellbore Blockage Mechanism and Blockage Removal Technology of Shale Gas Wells

Abstract With the continuous extension of development time, the production decline of single well is accelerated, and the problem of wellbore blockage in shale gas wells is prominent. The problem of wellbore blockage seriously restricts the stable production and efficient development of gas fields. In this paper, the ‘micro + macro’ analysis method is used to study the blockage. It is found that the wellbore blockage mainly includes corrosion, scaling products and a small amount of clay minerals brought by the reservoir during gas production. In the process of production, corrosion and scaling mechanism work together. Acidic gas such as CO2 in shale gas are dissolved in high-salinity formation water, causing electrochemical corrosion of the string. The formation of corrosion products will promote the deposition and adsorption of inorganic scales. The uneven accumulation of corrosion product films will enhance the surface roughness of the substrate and accelerate the deposition of scale samples around the crystal nucleus. At the same time, scaling will cause corrosion under the scale of the pipe string. Cl − can penetrate into the film through the micropores covering the product film on the metal surface, and pitting corrosion occurs to corrode the pipe string. Finally, the corrosion and scaling products together cause the pipe string to be blocked. Based on the analysis results of blockages and water samples, a blockage removal liquid system was developed according to the blockage mechanism. It has a high dissolution ability and the corrosion of 125SG, 155V and N80 steel sheets at 60°C for 4h is less than 1 g/(m 2 ·h), which meets the requirements of industry standards. This system can inhibit the secondary precipitation of metal ions, has low corrosion damage to oil and casing, can remove wellbore blockage, does not need to flow back, will not cause secondary damage to the reservoir. It can provide guiding significance for similar shale gas well wellbore blockage removal.

Authors

Institutions

Publication Details

Journal
Journal of Physics Conference Series
Published
2024-10-01
DOI
https://doi.org/10.1088/1742-6596/2834/1/012167
Citations
3
Primary Topic
Drilling and Well Engineering
Type
article
Field-Weighted Citation Impact
1.01
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Research on Wellbore Blockage Mechanism and Blockage Removal Technology of Shale Gas Wells

Pingli Liu, Qi Zou, Yaoshun Yuan, Jinming Liu et al.
3 citations
Journal of Physics Conference Series
Drilling and Well Engineering
1.01
article

Research on Wellbore Blockage Mechanism and Blockage Removal Technology of Shale Gas Wells

Pingli Liu, Qi Zou, Yaoshun Yuan, Jinming Liu, Juan Du, Chen Xiang
article en
3 citations

Abstract

Abstract With the continuous extension of development time, the production decline of single well is accelerated, and the problem of wellbore blockage in shale gas wells is prominent. The problem of wellbore blockage seriously restricts the stable production and efficient development of gas fields. In this paper, the ‘micro + macro’ analysis method is used to study the blockage. It is found that the wellbore blockage mainly includes corrosion, scaling products and a small amount of clay minerals brought by the reservoir during gas production. In the process of production, corrosion and scaling mechanism work together. Acidic gas such as CO2 in shale gas are dissolved in high-salinity formation water, causing electrochemical corrosion of the string. The formation of corrosion products will promote the deposition and adsorption of inorganic scales. The uneven accumulation of corrosion product films will enhance the surface roughness of the substrate and accelerate the deposition of scale samples around the crystal nucleus. At the same time, scaling will cause corrosion under the scale of the pipe string. Cl − can penetrate into the film through the micropores covering the product film on the metal surface, and pitting corrosion occurs to corrode the pipe string. Finally, the corrosion and scaling products together cause the pipe string to be blocked. Based on the analysis results of blockages and water samples, a blockage removal liquid system was developed according to the blockage mechanism. It has a high dissolution ability and the corrosion of 125SG, 155V and N80 steel sheets at 60°C for 4h is less than 1 g/(m 2 ·h), which meets the requirements of industry standards. This system can inhibit the secondary precipitation of metal ions, has low corrosion damage to oil and casing, can remove wellbore blockage, does not need to flow back, will not cause secondary damage to the reservoir. It can provide guiding significance for similar shale gas well wellbore blockage removal.

Journal of Physics Conference SeriesVol. 2834(1)
Southwest Petroleum University (CN)
Openalex Percentile: Top 24%
Drilling and Well Engineering
1.01
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.