Research and Application of Plugging Drilling and Completion Technology for Difficult Old Well in Changchun Gas Storage

Abstract Changchun Gas Storage has been included in the 14th Five-Year Plan for the development of petroleum and natural gas in Jilin Province. Its smooth construction and safe operation are crucial to ensure the stable supply of natural gas in Changchun. Well X106F located in the construction area was abandoned in 1988 due to drilling tool falling and multiple salvage failures. In order to ensure the sealing and integrity of the gas storage, it is necessary to effectively plug the drilling cover. In view of the problems of low well history accuracy, poor well wall stability and difficulty in cementing large boreholes, open hole drilling, trajectory design and control, film-forming and wall-fixing drilling fluid and prestressed cementing technologies are applied. By optimizing drilling tools, optimizing drilling parameters, designing the three-opening well structure and “five-section” profile, the plugging well construction requirements are met. The first and second open drilling along the old well borehole, 1313m deep on the first try to find top of the fish, after cementing plug, side tracking to 50m below the top of the fish and then cementing;for third spud control trajectory to accompanied the old well, according to the results of passive magnetic guidance, real-time adjustment of the trajectory scheme and construction plan, finally successfully collided with the old well at 1893m deep, after cementing the drilling plug, perforating and extruding cement, the cement job quality is good. The whole well construction period of 100 days, creating the fastest record of the old well plugging without trajectory of the fish type, providing technical support for the construction of Changchun gas storage, and providing experience for the same type of old well plugging and complex well treatment in China.

Authors

Institutions

Publication Details

Journal
Journal of Physics Conference Series
Published
2024-10-01
DOI
https://doi.org/10.1088/1742-6596/2834/1/012074
Primary Topic
Drilling and Well Engineering
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Research and Application of Plugging Drilling and Completion Technology for Difficult Old Well in Changchun Gas Storage

Changdong Liu, Hongbin Gong, Chuan Qing, Qiang Liu et al.
Journal of Physics Conference Series
Drilling and Well Engineering
article

Research and Application of Plugging Drilling and Completion Technology for Difficult Old Well in Changchun Gas Storage

Changdong Liu, Hongbin Gong, Chuan Qing, Qiang Liu, Xiaohui Zhang
article en

Abstract

Abstract Changchun Gas Storage has been included in the 14th Five-Year Plan for the development of petroleum and natural gas in Jilin Province. Its smooth construction and safe operation are crucial to ensure the stable supply of natural gas in Changchun. Well X106F located in the construction area was abandoned in 1988 due to drilling tool falling and multiple salvage failures. In order to ensure the sealing and integrity of the gas storage, it is necessary to effectively plug the drilling cover. In view of the problems of low well history accuracy, poor well wall stability and difficulty in cementing large boreholes, open hole drilling, trajectory design and control, film-forming and wall-fixing drilling fluid and prestressed cementing technologies are applied. By optimizing drilling tools, optimizing drilling parameters, designing the three-opening well structure and “five-section” profile, the plugging well construction requirements are met. The first and second open drilling along the old well borehole, 1313m deep on the first try to find top of the fish, after cementing plug, side tracking to 50m below the top of the fish and then cementing;for third spud control trajectory to accompanied the old well, according to the results of passive magnetic guidance, real-time adjustment of the trajectory scheme and construction plan, finally successfully collided with the old well at 1893m deep, after cementing the drilling plug, perforating and extruding cement, the cement job quality is good. The whole well construction period of 100 days, creating the fastest record of the old well plugging without trajectory of the fish type, providing technical support for the construction of Changchun gas storage, and providing experience for the same type of old well plugging and complex well treatment in China.

Journal of Physics Conference SeriesVol. 2834(1)
Daqing Oilfield General Hospital (CN), GA Drilling (Slovakia) (SK), China National Petroleum Corporation (China) (CN)
Openalex Percentile: Top 73%
Drilling and Well Engineering
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.