Development and Application of Reservoir Operation Method Based on Pre-Release Index for Control of Exceedance Floods

The pre-release operation has the potential to enhance the ability of a reservoir to manage exceedance floods. However, the mechanisms for the initiation and termination of such operations are unclear, and a clear method for calculating the pre-release water amount at each time step of the scheduling phase is lacking. To address this, the framework and mathematical expression for a pre-release index are proposed herein, and a refined pre-release scheduling model is developed based on the pre-release indices and their thresholds. Then, the proposed pre-release operation model is applied to the Shuifumiao Reservoir in the Lianshui River Basin in Hunan Province, China. The simulation results demonstrate that the refined pre-release scheduling model can effectively prevent exceedance floods, ensuring the safety of flood control without compromising the effectiveness of water supply safety. The proposed model provides a valuable framework and tool for enhancing the ability of reservoir operators to manage flood events and improve overall flood control safety.

Authors

Institutions

Publication Details

Journal
Water
Published
2024-11-10
DOI
https://doi.org/10.3390/w16223229
Citations
5
Primary Topic
Water resources management and optimization
Type
article
Field-Weighted Citation Impact
1.68

Funders

Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Development and Application of Reservoir Operation Method Based on Pre-Release Index for Control of Exceedance Floods

W. Li, Sizhong He, Yixin Yang, Cao Huang
5 citations
Water
Water resources management and optimization
1.68
article

Development and Application of Reservoir Operation Method Based on Pre-Release Index for Control of Exceedance Floods

W. Li, Sizhong He, Yixin Yang, Cao Huang
article en
5 citations

Abstract

The pre-release operation has the potential to enhance the ability of a reservoir to manage exceedance floods. However, the mechanisms for the initiation and termination of such operations are unclear, and a clear method for calculating the pre-release water amount at each time step of the scheduling phase is lacking. To address this, the framework and mathematical expression for a pre-release index are proposed herein, and a refined pre-release scheduling model is developed based on the pre-release indices and their thresholds. Then, the proposed pre-release operation model is applied to the Shuifumiao Reservoir in the Lianshui River Basin in Hunan Province, China. The simulation results demonstrate that the refined pre-release scheduling model can effectively prevent exceedance floods, ensuring the safety of flood control without compromising the effectiveness of water supply safety. The proposed model provides a valuable framework and tool for enhancing the ability of reservoir operators to manage flood events and improve overall flood control safety.

WaterVol. 16(22)
China Institute of Water Resources and Hydropower Research (CN), Hunan Research Academy of Environmental Sciences (CN), Guangdong Research Institute of Water Resources and Hydropower (CN), Changsha University of Science and Technology (CN)
National Natural Science Foundation of China, Science and Technology Program of Hunan Province, National Key Research and Development Program of China
Clean water and sanitation
Openalex Percentile: Top 17%
Water resources management and optimization
1.68
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.