Convergence of Hybrid Grey Wolf Optimization with Heuristic Approaches for Enhanced Job Shop Scheduling

This scholarly inquiry examines the utilization of the Hybrid Grey Wolf Optimization Algorithm (HGWOA) in addressing the Job Shop Scheduling Problem (JSSP), a combinatorial optimization problem commonly encountered within production management. The central aim is to minimize makespan, defined as the cumulative duration necessary to finalize all tasks on a designated set of machines while observing precedence constraints. Conventional Optimization methodologies frequently encounter difficulties with intricate instances of JSSP owing to its NP-hard classification. We introduce a ground-breaking method the Grey Wolf Optimization Algorithm (GWOA) with various meta-heuristic strategies to augment its fruitfulness in resolving JSSP. The multiple findings underscore the usefulness of HGWOA, highlighting its prospective applicability in real-world contexts of production scheduling and management.

Authors

Institutions

Publication Details

Journal
International Journal of Innovative Research in Computer Science & Technology
Published
2024-11-01
DOI
https://doi.org/10.55524/ijircst.2024.12.6.2
Primary Topic
Scheduling and Optimization Algorithms
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Convergence of Hybrid Grey Wolf Optimization with Heuristic Approaches for Enhanced Job Shop Scheduling

Ankush Sharma, Swati Jadon, Anugrah Shailay
International Journal of Innovative Research in Computer Science & Technology
Scheduling and Optimization Algorithms
article

Convergence of Hybrid Grey Wolf Optimization with Heuristic Approaches for Enhanced Job Shop Scheduling

Ankush Sharma, Swati Jadon, Anugrah Shailay
article en

Abstract

This scholarly inquiry examines the utilization of the Hybrid Grey Wolf Optimization Algorithm (HGWOA) in addressing the Job Shop Scheduling Problem (JSSP), a combinatorial optimization problem commonly encountered within production management. The central aim is to minimize makespan, defined as the cumulative duration necessary to finalize all tasks on a designated set of machines while observing precedence constraints. Conventional Optimization methodologies frequently encounter difficulties with intricate instances of JSSP owing to its NP-hard classification. We introduce a ground-breaking method the Grey Wolf Optimization Algorithm (GWOA) with various meta-heuristic strategies to augment its fruitfulness in resolving JSSP. The multiple findings underscore the usefulness of HGWOA, highlighting its prospective applicability in real-world contexts of production scheduling and management.

International Journal of Innovative Research in Computer Science & TechnologyVol. 12(6)
Gurukul School of Design (IN)
Decent work and economic growth
Openalex Percentile: Top 71%
Scheduling and Optimization Algorithms
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.