Successful international validation test shipment of the PIP-II HB650 cryomodule transportation system

The PIP-II Project will receive fully assembled cryomodules from CEA and STFC-UKRI as in-kind contributions. Damage to these cryomodules during transport is understood to be a significant risk to the project, so an extensive testing and validation program has been executed to mitigate this risk. The centerpiece of this effort was the successful shipment, from FNAL to STFC-UKRI and back, of a prototype HB650 cryomodule with cold testing before and after shipment to verify no functionality changes from shipment. Building on an escalating test transport program, the prototype cryomodule was shipped to the UK and back using realistic logistics, handling, instrumentation, and planning. The process of executing this shipment, lessons learned, and plan moving forward will be presented here.

Authors

Institutions

Publication Details

Journal
OSTI OAI (U.S. Department of Energy Office of Scientific and Technical Information)
Published
2024-10-25
DOI
https://doi.org/10.18429/jacow-linac2024-mopb065
Primary Topic
Superconducting Materials and Applications
Type
article
Field-Weighted Citation Impact
0.00

Funders

Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Successful international validation test shipment of the PIP-II HB650 cryomodule transportation system

Jeremiah Holzbauer, J. Ozelis, A. Wixson, M. Kane et al.
OSTI OAI (U.S. Department of Energy Office of Scientific and Technical Information)
Superconducting Materials and Applications
article

Successful international validation test shipment of the PIP-II HB650 cryomodule transportation system

Jeremiah Holzbauer, J. Ozelis, A. Wixson, M. Kane, J. Helsper
article en

Abstract

The PIP-II Project will receive fully assembled cryomodules from CEA and STFC-UKRI as in-kind contributions. Damage to these cryomodules during transport is understood to be a significant risk to the project, so an extensive testing and validation program has been executed to mitigate this risk. The centerpiece of this effort was the successful shipment, from FNAL to STFC-UKRI and back, of a prototype HB650 cryomodule with cold testing before and after shipment to verify no functionality changes from shipment. Building on an escalating test transport program, the prototype cryomodule was shipped to the UK and back using realistic logistics, handling, instrumentation, and planning. The process of executing this shipment, lessons learned, and plan moving forward will be presented here.

OSTI OAI (U.S. Department of Energy Office of Scientific and Technical Information)
Fermi National Accelerator Laboratory (US), Science and Technology Facilities Council (GB), Sci-Tech Daresbury (GB)
U.S. Department of Energy, UK Research and Innovation, Science and Technology Facilities Council, Fermilab
Openalex Percentile: Top 81%
Superconducting Materials and Applications
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Successful international validation test shipment of the PIP-II HB650 cryomodule transportation system — Jeremiah Holzbauer, J. Ozelis, et al. · OSTI OAI (U.S. Department of Energy Office of Scientific and Technical Information) (2024) | TGRS Research Map | TGRS