Influence of Water Ingress at the Shield Tunnel Portal on Tunnel Deformation and Load Capacity Weakening

Abstract. During the construction of shield tunnels, adverse geological conditions can lead to tunnel segment settlement and damage. This study investigates the deformation patterns and changes in load capacity of shield tunnels under water ingress conditions at the portal, using a segment of the Jinan Metro as a case study. Through field measurements and numerical simulations, we analyzed the structural deformation and weakening of load capacity caused by water ingress. The results indicate that significant settlement occurs at both the tunnel crown and invert after water ingress, with a maximum settlement of 181.2 mm compared to the original design axis. The deformation profile of the tunnel primarily resembles a transverse "duck egg" shape, while the segments near the portal exhibit vertical "duck egg" deformations due to grouting and other factors. Multiple cracks and damages were observed in the segments, with up to 16 cracks found in a single ring. Compared to the original design conditions, the bending moment in the tunnel lining increased by approximately 7%, and the axial force increased by about 9%, leading to an 11% reduction in tunnel resistance effects. The findings of this study regarding tunnel lining deformation and load capacity weakening provide valuable insights for similar engineering projects.

Authors

Institutions

Publication Details

Journal
Applied and Computational Engineering
Published
2024-11-08
DOI
https://doi.org/10.54254/2755-2721/98/20241121
Primary Topic
Civil and Geotechnical Engineering Research
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Influence of Water Ingress at the Shield Tunnel Portal on Tunnel Deformation and Load Capacity Weakening

X. Philip Ye, Yongliang Huang, Hu Li, Kai Wang
Applied and Computational Engineering
Civil and Geotechnical Engineering Research
article

Influence of Water Ingress at the Shield Tunnel Portal on Tunnel Deformation and Load Capacity Weakening

X. Philip Ye, Yongliang Huang, Hu Li, Kai Wang
article en

Abstract

Abstract. During the construction of shield tunnels, adverse geological conditions can lead to tunnel segment settlement and damage. This study investigates the deformation patterns and changes in load capacity of shield tunnels under water ingress conditions at the portal, using a segment of the Jinan Metro as a case study. Through field measurements and numerical simulations, we analyzed the structural deformation and weakening of load capacity caused by water ingress. The results indicate that significant settlement occurs at both the tunnel crown and invert after water ingress, with a maximum settlement of 181.2 mm compared to the original design axis. The deformation profile of the tunnel primarily resembles a transverse "duck egg" shape, while the segments near the portal exhibit vertical "duck egg" deformations due to grouting and other factors. Multiple cracks and damages were observed in the segments, with up to 16 cracks found in a single ring. Compared to the original design conditions, the bending moment in the tunnel lining increased by approximately 7%, and the axial force increased by about 9%, leading to an 11% reduction in tunnel resistance effects. The findings of this study regarding tunnel lining deformation and load capacity weakening provide valuable insights for similar engineering projects.

Applied and Computational EngineeringVol. 98(1)
Shanghai Tunnel Engineering Rail Transit Design & Research Institute (CN)
Openalex Percentile: Top 61%
Civil and Geotechnical Engineering Research
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Influence of Water Ingress at the Shield Tunnel Portal on Tunnel Deformation and Load Capacity Weakening — X. Philip Ye, Yongliang Huang, et al. · Applied and Computational Engineering (2024) | TGRS Research Map | TGRS